{"title":"Gahcho ku<s:1>钻石矿:政府间环境管理案例研究","authors":"Rick Walbourne","doi":"10.22584/nr51.2021.008","DOIUrl":null,"url":null,"abstract":"The Gahcho Kue Diamond Mine is an operating mine in the Northwest Territories, Canada. Due to requirements defined in law, the mine required several authorizations for construction and operation, including both federal and territorial authorizations. Throughout the construction and operation of the diamond mine, instances occurred when the proponent, De Beers Canada Inc., raised objections about applying conditions in the water licence to areas that were authorized by Fisheries and Oceans Canada. As well, there have been ongoing discussions between various parties, including those with regulatory mandates, regarding requirements and jurisdiction related to site closure planning. This article outlines the discussions that have occurred to date, detailing the areas of ambiguity regarding projects that are authorized under multiple pieces of legislation. Lessons learned, as well as recommendations to address some of these issues, are provided.","PeriodicalId":308485,"journal":{"name":"The Northern Review","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Gahcho Kué Diamond Mine: A Case Study in Intergovernmental Environmental Management\",\"authors\":\"Rick Walbourne\",\"doi\":\"10.22584/nr51.2021.008\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Gahcho Kue Diamond Mine is an operating mine in the Northwest Territories, Canada. Due to requirements defined in law, the mine required several authorizations for construction and operation, including both federal and territorial authorizations. Throughout the construction and operation of the diamond mine, instances occurred when the proponent, De Beers Canada Inc., raised objections about applying conditions in the water licence to areas that were authorized by Fisheries and Oceans Canada. As well, there have been ongoing discussions between various parties, including those with regulatory mandates, regarding requirements and jurisdiction related to site closure planning. This article outlines the discussions that have occurred to date, detailing the areas of ambiguity regarding projects that are authorized under multiple pieces of legislation. Lessons learned, as well as recommendations to address some of these issues, are provided.\",\"PeriodicalId\":308485,\"journal\":{\"name\":\"The Northern Review\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-05-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Northern Review\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22584/nr51.2021.008\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Northern Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22584/nr51.2021.008","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

Gahcho Kue钻石矿是加拿大西北地区的一个正在运营的矿山。由于法律规定的要求,该矿的建设和运营需要几项授权,包括联邦和地区的授权。在整个钻石矿的建设和经营过程中,曾发生过这样的情况,即提议方戴比尔斯加拿大公司对将水许可证的条件适用于加拿大渔业和海洋部授权的地区提出异议。此外,各当事方之间,包括那些有管理任务的当事方之间,正在就有关场址关闭规划的要求和管辖权进行讨论。本文概述了迄今为止发生的讨论,详细介绍了在多个立法授权下的项目的模糊领域。本文提供了经验教训以及解决其中一些问题的建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Gahcho Kué Diamond Mine: A Case Study in Intergovernmental Environmental Management
The Gahcho Kue Diamond Mine is an operating mine in the Northwest Territories, Canada. Due to requirements defined in law, the mine required several authorizations for construction and operation, including both federal and territorial authorizations. Throughout the construction and operation of the diamond mine, instances occurred when the proponent, De Beers Canada Inc., raised objections about applying conditions in the water licence to areas that were authorized by Fisheries and Oceans Canada. As well, there have been ongoing discussions between various parties, including those with regulatory mandates, regarding requirements and jurisdiction related to site closure planning. This article outlines the discussions that have occurred to date, detailing the areas of ambiguity regarding projects that are authorized under multiple pieces of legislation. Lessons learned, as well as recommendations to address some of these issues, are provided.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信