{"title":"Gahcho ku<s:1>钻石矿:政府间环境管理案例研究","authors":"Rick Walbourne","doi":"10.22584/nr51.2021.008","DOIUrl":null,"url":null,"abstract":"The Gahcho Kue Diamond Mine is an operating mine in the Northwest Territories, Canada. Due to requirements defined in law, the mine required several authorizations for construction and operation, including both federal and territorial authorizations. Throughout the construction and operation of the diamond mine, instances occurred when the proponent, De Beers Canada Inc., raised objections about applying conditions in the water licence to areas that were authorized by Fisheries and Oceans Canada. As well, there have been ongoing discussions between various parties, including those with regulatory mandates, regarding requirements and jurisdiction related to site closure planning. This article outlines the discussions that have occurred to date, detailing the areas of ambiguity regarding projects that are authorized under multiple pieces of legislation. Lessons learned, as well as recommendations to address some of these issues, are provided.","PeriodicalId":308485,"journal":{"name":"The Northern Review","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Gahcho Kué Diamond Mine: A Case Study in Intergovernmental Environmental Management\",\"authors\":\"Rick Walbourne\",\"doi\":\"10.22584/nr51.2021.008\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Gahcho Kue Diamond Mine is an operating mine in the Northwest Territories, Canada. Due to requirements defined in law, the mine required several authorizations for construction and operation, including both federal and territorial authorizations. Throughout the construction and operation of the diamond mine, instances occurred when the proponent, De Beers Canada Inc., raised objections about applying conditions in the water licence to areas that were authorized by Fisheries and Oceans Canada. As well, there have been ongoing discussions between various parties, including those with regulatory mandates, regarding requirements and jurisdiction related to site closure planning. This article outlines the discussions that have occurred to date, detailing the areas of ambiguity regarding projects that are authorized under multiple pieces of legislation. Lessons learned, as well as recommendations to address some of these issues, are provided.\",\"PeriodicalId\":308485,\"journal\":{\"name\":\"The Northern Review\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-05-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Northern Review\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22584/nr51.2021.008\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Northern Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22584/nr51.2021.008","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The Gahcho Kué Diamond Mine: A Case Study in Intergovernmental Environmental Management
The Gahcho Kue Diamond Mine is an operating mine in the Northwest Territories, Canada. Due to requirements defined in law, the mine required several authorizations for construction and operation, including both federal and territorial authorizations. Throughout the construction and operation of the diamond mine, instances occurred when the proponent, De Beers Canada Inc., raised objections about applying conditions in the water licence to areas that were authorized by Fisheries and Oceans Canada. As well, there have been ongoing discussions between various parties, including those with regulatory mandates, regarding requirements and jurisdiction related to site closure planning. This article outlines the discussions that have occurred to date, detailing the areas of ambiguity regarding projects that are authorized under multiple pieces of legislation. Lessons learned, as well as recommendations to address some of these issues, are provided.