{"title":"识别不同的项目类型","authors":"T. Kippenberger","doi":"10.1108/EUM0000000006782","DOIUrl":null,"url":null,"abstract":"Reckons that change tends to generate more change and projects should only be undertaken under extreme need to solve a problem — something that may stop one achieving the goals (as long as one knows what the goals are!). Believes there are 4 different types of concept underlying all projects and discusses these in depth. Suggests that in assembling project teams the main requirements are team leaders and team members — of which a balanced need is: doers; solvers; checkers; and knowers. Concludes projects have to be treated differently to add value in the correct areas.","PeriodicalId":178456,"journal":{"name":"The Antidote","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Recognizing different project types\",\"authors\":\"T. Kippenberger\",\"doi\":\"10.1108/EUM0000000006782\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Reckons that change tends to generate more change and projects should only be undertaken under extreme need to solve a problem — something that may stop one achieving the goals (as long as one knows what the goals are!). Believes there are 4 different types of concept underlying all projects and discusses these in depth. Suggests that in assembling project teams the main requirements are team leaders and team members — of which a balanced need is: doers; solvers; checkers; and knowers. Concludes projects have to be treated differently to add value in the correct areas.\",\"PeriodicalId\":178456,\"journal\":{\"name\":\"The Antidote\",\"volume\":\"56 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2000-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Antidote\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1108/EUM0000000006782\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Antidote","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/EUM0000000006782","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

认为改变往往会产生更多的变化,项目应该只在极端需要解决问题的情况下进行——这可能会阻止一个人实现目标(只要一个人知道目标是什么!)相信所有项目背后都有4种不同类型的概念,并深入讨论了这些概念。建议在组建项目团队时,主要需求是团队领导和团队成员——其中平衡的需求是:实干家;解决者;检查;和本性。结束的项目必须以不同的方式对待,以便在正确的领域增加价值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Recognizing different project types
Reckons that change tends to generate more change and projects should only be undertaken under extreme need to solve a problem — something that may stop one achieving the goals (as long as one knows what the goals are!). Believes there are 4 different types of concept underlying all projects and discusses these in depth. Suggests that in assembling project teams the main requirements are team leaders and team members — of which a balanced need is: doers; solvers; checkers; and knowers. Concludes projects have to be treated differently to add value in the correct areas.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信