贫民窟质量改善项目工作延误分析

M. Ardika, S. Sufrianto, Hujiyanto Hujiyanto, Sitti Hawa
{"title":"贫民窟质量改善项目工作延误分析","authors":"M. Ardika, S. Sufrianto, Hujiyanto Hujiyanto, Sitti Hawa","doi":"10.54297/sciej.v4i1.461","DOIUrl":null,"url":null,"abstract":"A construction project is an activity that aims to build facilities and infrastructure within the planned timeframe. The project can be defined as an organized effort or activity that uses the available budget and resources that must be achieved to achieve important goals, objectives, and expectations using the existing budget and resources, which must be completed within the planned timeframe so that the project does not experience delays. The purpose of this study was to determine how much work delays, the factors that cause work delays and how much influence the delay factors have on work delays in the Puday- Lapulu Slums Quality Improvement Project. \nThe results of this study indicate the value of SV is Rp. (- 8.25 %) While the value of SPI < 1 is 0.896 < 1, based on the criteria for the value of SV and SPI, it can be said that the work is late and has poor performance. Factors that influence delays are aspects of labor and materials. While the large influence of delay factors on work delays that is 10,9 %.","PeriodicalId":275633,"journal":{"name":"Sultra Civil Engineering Journal","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-04-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis Of Work Delay In Slum Quality Improvement Project Puday-Lapulu\",\"authors\":\"M. Ardika, S. Sufrianto, Hujiyanto Hujiyanto, Sitti Hawa\",\"doi\":\"10.54297/sciej.v4i1.461\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A construction project is an activity that aims to build facilities and infrastructure within the planned timeframe. The project can be defined as an organized effort or activity that uses the available budget and resources that must be achieved to achieve important goals, objectives, and expectations using the existing budget and resources, which must be completed within the planned timeframe so that the project does not experience delays. The purpose of this study was to determine how much work delays, the factors that cause work delays and how much influence the delay factors have on work delays in the Puday- Lapulu Slums Quality Improvement Project. \\nThe results of this study indicate the value of SV is Rp. (- 8.25 %) While the value of SPI < 1 is 0.896 < 1, based on the criteria for the value of SV and SPI, it can be said that the work is late and has poor performance. Factors that influence delays are aspects of labor and materials. While the large influence of delay factors on work delays that is 10,9 %.\",\"PeriodicalId\":275633,\"journal\":{\"name\":\"Sultra Civil Engineering Journal\",\"volume\":\"15 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-04-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Sultra Civil Engineering Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.54297/sciej.v4i1.461\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Sultra Civil Engineering Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54297/sciej.v4i1.461","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

建设项目是指在计划的时间框架内建造设施和基础设施的活动。项目可以被定义为一个有组织的工作或活动,它使用可用的预算和资源,必须使用现有的预算和资源来实现重要的目标、目的和期望,它必须在计划的时间范围内完成,以便项目不会经历延迟。本研究的目的是确定Puday- Lapulu贫民窟质量改善项目的工作延误程度,导致工作延误的因素以及延误因素对工作延误的影响程度。本研究结果表明,SV值为Rp。(- 8.25%)而SPI < 1的值为0.896 < 1,根据SV和SPI值的判定标准,可以说工作进度较晚,性能较差。影响延误的因素是劳动力和材料方面。而延迟因素对工作延迟的影响较大,为10.9%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis Of Work Delay In Slum Quality Improvement Project Puday-Lapulu
A construction project is an activity that aims to build facilities and infrastructure within the planned timeframe. The project can be defined as an organized effort or activity that uses the available budget and resources that must be achieved to achieve important goals, objectives, and expectations using the existing budget and resources, which must be completed within the planned timeframe so that the project does not experience delays. The purpose of this study was to determine how much work delays, the factors that cause work delays and how much influence the delay factors have on work delays in the Puday- Lapulu Slums Quality Improvement Project. The results of this study indicate the value of SV is Rp. (- 8.25 %) While the value of SPI < 1 is 0.896 < 1, based on the criteria for the value of SV and SPI, it can be said that the work is late and has poor performance. Factors that influence delays are aspects of labor and materials. While the large influence of delay factors on work delays that is 10,9 %.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信