{"title":"万盛黑山谷旅游园区水资源配置规划研究 Water Resources Allocation on Heishangu Tourism Park in Wansheng District","authors":"曹磊, 王渺林","doi":"10.12677/JWRR.2017.65061","DOIUrl":null,"url":null,"abstract":"万盛黑山谷旅游园区目前供水主要依靠山泉水和鲤鱼河河道水,随着区域内旅游经济和旅游地产的飞速发展,现有的供水工程规模已经远远不能满足当前的用水需求。通过对比分析,本文提出将羊喝坪水库和南部鲤鱼河提水工程共同作为可靠的供水水源,较好地解决了各片区用水需求;该方案虽然运行费用较高,但由于供水水量较大的缘故,其运行成本水价和总成本水价反而最优,并且新建羊喝坪水库对黑山谷核心景区影响甚微。 Currently, Heishangu Tourist Park’s water supplies mainly rely on mountain spring and Liyu River. As the rapid development of tourism economy and real estate, the present water supply projects are not sufficient to meet the growing regional water demand. Through water resources allocation plans coop-eration, the Yangheping Reservoir and south Liyu River combined water project is the most optimal solution. Though higher operation costs, the operating cost water price and whole-cost water price of this allocation project is still optimal, for its larger water supply, as well as the lower influence to the core scenic spots of Heishangu Tourist Park.","PeriodicalId":349946,"journal":{"name":"Journal of Water Resources Research","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-08-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"万盛黑山谷旅游园区水资源配置规划研究 Water Resources Allocation on Heishangu Tourism Park in Wansheng District\",\"authors\":\"曹磊, 王渺林\",\"doi\":\"10.12677/JWRR.2017.65061\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"万盛黑山谷旅游园区目前供水主要依靠山泉水和鲤鱼河河道水,随着区域内旅游经济和旅游地产的飞速发展,现有的供水工程规模已经远远不能满足当前的用水需求。通过对比分析,本文提出将羊喝坪水库和南部鲤鱼河提水工程共同作为可靠的供水水源,较好地解决了各片区用水需求;该方案虽然运行费用较高,但由于供水水量较大的缘故,其运行成本水价和总成本水价反而最优,并且新建羊喝坪水库对黑山谷核心景区影响甚微。 Currently, Heishangu Tourist Park’s water supplies mainly rely on mountain spring and Liyu River. As the rapid development of tourism economy and real estate, the present water supply projects are not sufficient to meet the growing regional water demand. Through water resources allocation plans coop-eration, the Yangheping Reservoir and south Liyu River combined water project is the most optimal solution. Though higher operation costs, the operating cost water price and whole-cost water price of this allocation project is still optimal, for its larger water supply, as well as the lower influence to the core scenic spots of Heishangu Tourist Park.\",\"PeriodicalId\":349946,\"journal\":{\"name\":\"Journal of Water Resources Research\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-08-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Water Resources Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.12677/JWRR.2017.65061\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Water Resources Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12677/JWRR.2017.65061","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
万盛黑山谷旅游园区目前供水主要依靠山泉水和鲤鱼河河道水,随着区域内旅游经济和旅游地产的飞速发展,现有的供水工程规模已经远远不能满足当前的用水需求。通过对比分析,本文提出将羊喝坪水库和南部鲤鱼河提水工程共同作为可靠的供水水源,较好地解决了各片区用水需求;该方案虽然运行费用较高,但由于供水水量较大的缘故,其运行成本水价和总成本水价反而最优,并且新建羊喝坪水库对黑山谷核心景区影响甚微。 Currently, Heishangu Tourist Park’s water supplies mainly rely on mountain spring and Liyu River. As the rapid development of tourism economy and real estate, the present water supply projects are not sufficient to meet the growing regional water demand. Through water resources allocation plans coop-eration, the Yangheping Reservoir and south Liyu River combined water project is the most optimal solution. Though higher operation costs, the operating cost water price and whole-cost water price of this allocation project is still optimal, for its larger water supply, as well as the lower influence to the core scenic spots of Heishangu Tourist Park.
万盛黑山谷旅游园区水资源配置规划研究 Water Resources Allocation on Heishangu Tourism Park in Wansheng District
万盛黑山谷旅游园区目前供水主要依靠山泉水和鲤鱼河河道水,随着区域内旅游经济和旅游地产的飞速发展,现有的供水工程规模已经远远不能满足当前的用水需求。通过对比分析,本文提出将羊喝坪水库和南部鲤鱼河提水工程共同作为可靠的供水水源,较好地解决了各片区用水需求;该方案虽然运行费用较高,但由于供水水量较大的缘故,其运行成本水价和总成本水价反而最优,并且新建羊喝坪水库对黑山谷核心景区影响甚微。 Currently, Heishangu Tourist Park’s water supplies mainly rely on mountain spring and Liyu River. As the rapid development of tourism economy and real estate, the present water supply projects are not sufficient to meet the growing regional water demand. Through water resources allocation plans coop-eration, the Yangheping Reservoir and south Liyu River combined water project is the most optimal solution. Though higher operation costs, the operating cost water price and whole-cost water price of this allocation project is still optimal, for its larger water supply, as well as the lower influence to the core scenic spots of Heishangu Tourist Park.