{"title":"NoC井的持续环空压力。高分子隔离材料的预防和修复","authors":"Sofia Rivelli Lavallen, Luciana Martina García Eiler, M. Mucci, Lucas Martin Arribillaga Jofre, José Gimutky, W. Morris","doi":"10.2118/212580-ms","DOIUrl":null,"url":null,"abstract":"\n Sustained Annulus Pressure (SAP) is a common issue that affects shale plays wells worldwide. The cement sheath barrier deteriorates due to extremely high hoop stresses generated in the cement annulus during fracture treatments. These stresses are approximately one order of magnitude higher than the cement maximum tensile stress.\n Once cement sheath fails, gas or oil migrates from high-pressured subsurface formations through vertical cracks along the annulus. Pressure at the wellhead can reach values above the installation maximum rate which persistently rebuilds after bleed-down operations.\n The presence of SAP means that well integrity has been compromised generating serious safety and environmental risks for operators.\n After conducting several finite element simulation studies, that demonstrated the failure hypothesis, a research project was conducted to design an isolating material that would withstand service conditions generated during well termination and its overall life cycle. A polymeric sealing ma terial with high deformation capacity, consequently low Young's modulus, high toughness and bonding properties was developed.\n The material was tested following API recommended practices and ASTM standards. A procedure to prevent SAP in new wells was proposed. Five well of different Vaca Muerta shale fields were isolated combining a cement slurry batch with the polymeric system pumped in tandem. Also, a repair procedure for wells showing SAP was proposed and successfully tested using a similar polymeric sys tem. This procedure consisted of injecting a 14.8 ppg formulation in the annulus in a pump and relief (P&R) manner. The pilot test is currently under evaluation. Wells isolated with the polymeric system have not presented SAP after more than six months, nor have the two remediation jobs conducted so far. Annular pressure of new and repaired wells is being monitored to determine treatment effectiveness.","PeriodicalId":357695,"journal":{"name":"Day 2 Tue, March 21, 2023","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Sustained Anulus Pressure in NoC Wells. Prevention and Remediation Using Polymeric Isolating Materials\",\"authors\":\"Sofia Rivelli Lavallen, Luciana Martina García Eiler, M. Mucci, Lucas Martin Arribillaga Jofre, José Gimutky, W. Morris\",\"doi\":\"10.2118/212580-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Sustained Annulus Pressure (SAP) is a common issue that affects shale plays wells worldwide. The cement sheath barrier deteriorates due to extremely high hoop stresses generated in the cement annulus during fracture treatments. These stresses are approximately one order of magnitude higher than the cement maximum tensile stress.\\n Once cement sheath fails, gas or oil migrates from high-pressured subsurface formations through vertical cracks along the annulus. Pressure at the wellhead can reach values above the installation maximum rate which persistently rebuilds after bleed-down operations.\\n The presence of SAP means that well integrity has been compromised generating serious safety and environmental risks for operators.\\n After conducting several finite element simulation studies, that demonstrated the failure hypothesis, a research project was conducted to design an isolating material that would withstand service conditions generated during well termination and its overall life cycle. A polymeric sealing ma terial with high deformation capacity, consequently low Young's modulus, high toughness and bonding properties was developed.\\n The material was tested following API recommended practices and ASTM standards. A procedure to prevent SAP in new wells was proposed. Five well of different Vaca Muerta shale fields were isolated combining a cement slurry batch with the polymeric system pumped in tandem. Also, a repair procedure for wells showing SAP was proposed and successfully tested using a similar polymeric sys tem. This procedure consisted of injecting a 14.8 ppg formulation in the annulus in a pump and relief (P&R) manner. The pilot test is currently under evaluation. Wells isolated with the polymeric system have not presented SAP after more than six months, nor have the two remediation jobs conducted so far. Annular pressure of new and repaired wells is being monitored to determine treatment effectiveness.\",\"PeriodicalId\":357695,\"journal\":{\"name\":\"Day 2 Tue, March 21, 2023\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-03-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, March 21, 2023\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/212580-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, March 21, 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/212580-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

持续环空压力(SAP)是影响全球页岩井的常见问题。在压裂过程中,由于水泥环空产生极高的环向应力,导致水泥环屏障恶化。这些应力大约比水泥的最大拉应力高一个数量级。一旦水泥环失效,天然气或石油就会从高压地下地层沿环空垂直裂缝中运移出来。井口压力可以达到高于安装最大速率的值,在泄油作业后持续重建。SAP的存在意味着井的完整性受到了损害,给作业者带来了严重的安全和环境风险。在进行了几次有限元模拟研究后,验证了失效假设,然后进行了一个研究项目,设计一种能够承受完井过程中产生的服务条件及其整个生命周期的隔离材料。研制了一种具有高变形能力、低杨氏模量、高韧性和粘接性能的高分子密封材料。材料按照API推荐的做法和ASTM标准进行测试。提出了防止新井发生SAP的措施。在Vaca Muerta页岩油田的5口井中,将水泥泥浆与聚合物体系串联泵入进行隔离。此外,还提出了一种针对出现SAP的井的修复程序,并使用类似的聚合物体系进行了成功的测试。该过程包括通过泵和溢流(P&R)方式将14.8 ppg的配方注入环空。目前正在对试点测试进行评估。使用聚合物系统隔离的井在六个多月后没有出现SAP,到目前为止也没有进行两次修复工作。正在监测新井和修复井的环空压力,以确定处理效果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Sustained Anulus Pressure in NoC Wells. Prevention and Remediation Using Polymeric Isolating Materials
Sustained Annulus Pressure (SAP) is a common issue that affects shale plays wells worldwide. The cement sheath barrier deteriorates due to extremely high hoop stresses generated in the cement annulus during fracture treatments. These stresses are approximately one order of magnitude higher than the cement maximum tensile stress. Once cement sheath fails, gas or oil migrates from high-pressured subsurface formations through vertical cracks along the annulus. Pressure at the wellhead can reach values above the installation maximum rate which persistently rebuilds after bleed-down operations. The presence of SAP means that well integrity has been compromised generating serious safety and environmental risks for operators. After conducting several finite element simulation studies, that demonstrated the failure hypothesis, a research project was conducted to design an isolating material that would withstand service conditions generated during well termination and its overall life cycle. A polymeric sealing ma terial with high deformation capacity, consequently low Young's modulus, high toughness and bonding properties was developed. The material was tested following API recommended practices and ASTM standards. A procedure to prevent SAP in new wells was proposed. Five well of different Vaca Muerta shale fields were isolated combining a cement slurry batch with the polymeric system pumped in tandem. Also, a repair procedure for wells showing SAP was proposed and successfully tested using a similar polymeric sys tem. This procedure consisted of injecting a 14.8 ppg formulation in the annulus in a pump and relief (P&R) manner. The pilot test is currently under evaluation. Wells isolated with the polymeric system have not presented SAP after more than six months, nor have the two remediation jobs conducted so far. Annular pressure of new and repaired wells is being monitored to determine treatment effectiveness.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信