{"title":"铁路路网多边形运力平衡评价","authors":"A. Borodin, V. Panin, M. A. Ageeva, A. Sokolov, S. Y. Kirillova, E. Dmitriev, A. Kravchenko","doi":"10.21780/2223-9731-2022-81-2-158-169","DOIUrl":null,"url":null,"abstract":"Introduction. Traffic and transportation capacities of railway polygons and traffic flows are not constant throughout the year. Permissible capacity levels are determined by the condition of unhindered reception of trains by stations. It is necessary to calculate the balance of transportation capacity, making it possible to combine growing traffic with high rates with infrastructure development and repair works. The purpose of the study is to develop methodological solutions for assessing the balance of the railway transportation capacity and substantiating the procedure for implementing infrastructure measures in the context of the growing dynamics of the originating traffic and the tight deadlines for repairing and reconstructing the infrastructure.Materials and methods. The developed solutions are based on the data of the Russian Railways information systems, automated forecasting of the infrastructure and transportation resources of the railway network, and hybrid mathematical models.Results. The article presented the results of the substantiation of the normative restrictions on the daily time budget for the passage of trains, depending on the classification and specialisation of railway lines. The procedure for calculating the traffic capacity of sections with automatic locomotive signalling is determined as an independent means of interval control of train traffic with movable boundaries of block sections that change depending on the speed and mass of the train. The characteristics of the available, estimated, planned and required traffic and transportation capacities were determined with a distinction between measures for the development of traffic and transportation capacities and programs for improvement of infrastructure facilities. The authors put forward the problem of compromise management to ensure the required volumes of freight and passenger traffic, a given volume of reconstruction work on the development of infrastructure and repair work to maintain the required degree of its readiness. A classification of reconstructive, technological, organisational, technical and complex measures of influence on the unevenness of transport processes in the conditions of depletion of infrastructure and scheduling resources was presented.Discussion and conclusion. The developed solutions enable to increase the feasibility and efficiency of complex projects for the development of traffic and transportation capacities and measures to improve the operation of railway network polygons.","PeriodicalId":242112,"journal":{"name":"Russian Railway Science","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Assessment of transportation capacity balance of railway network polygons\",\"authors\":\"A. Borodin, V. Panin, M. A. Ageeva, A. Sokolov, S. Y. Kirillova, E. Dmitriev, A. Kravchenko\",\"doi\":\"10.21780/2223-9731-2022-81-2-158-169\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Introduction. Traffic and transportation capacities of railway polygons and traffic flows are not constant throughout the year. Permissible capacity levels are determined by the condition of unhindered reception of trains by stations. It is necessary to calculate the balance of transportation capacity, making it possible to combine growing traffic with high rates with infrastructure development and repair works. The purpose of the study is to develop methodological solutions for assessing the balance of the railway transportation capacity and substantiating the procedure for implementing infrastructure measures in the context of the growing dynamics of the originating traffic and the tight deadlines for repairing and reconstructing the infrastructure.Materials and methods. The developed solutions are based on the data of the Russian Railways information systems, automated forecasting of the infrastructure and transportation resources of the railway network, and hybrid mathematical models.Results. The article presented the results of the substantiation of the normative restrictions on the daily time budget for the passage of trains, depending on the classification and specialisation of railway lines. The procedure for calculating the traffic capacity of sections with automatic locomotive signalling is determined as an independent means of interval control of train traffic with movable boundaries of block sections that change depending on the speed and mass of the train. The characteristics of the available, estimated, planned and required traffic and transportation capacities were determined with a distinction between measures for the development of traffic and transportation capacities and programs for improvement of infrastructure facilities. The authors put forward the problem of compromise management to ensure the required volumes of freight and passenger traffic, a given volume of reconstruction work on the development of infrastructure and repair work to maintain the required degree of its readiness. A classification of reconstructive, technological, organisational, technical and complex measures of influence on the unevenness of transport processes in the conditions of depletion of infrastructure and scheduling resources was presented.Discussion and conclusion. The developed solutions enable to increase the feasibility and efficiency of complex projects for the development of traffic and transportation capacities and measures to improve the operation of railway network polygons.\",\"PeriodicalId\":242112,\"journal\":{\"name\":\"Russian Railway Science\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-06-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Russian Railway Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21780/2223-9731-2022-81-2-158-169\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Russian Railway Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21780/2223-9731-2022-81-2-158-169","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

介绍。铁路多边形的交通运输能力和交通流量在一年中不是恒定的。允许的载客量是由车站能否畅通无阻地接收列车而决定的。有必要计算运输能力的平衡,从而有可能将高速增长的交通与基础设施的发展和维修工程结合起来。这项研究的目的是制定方法学上的解决办法,以评估铁路运输能力的平衡,并在原始交通日益增长的动态和修复和重建基础设施的紧迫期限的背景下,确定实施基础设施措施的程序。材料和方法。开发的解决方案基于俄罗斯铁路信息系统的数据,铁路网络基础设施和运输资源的自动预测以及混合数学模型的结果。本文提出了根据铁路线路的分类和专业化,对火车通行的日常时间预算进行规范限制的结果。确定了机车自动信号区段通行能力的计算方法,作为列车交通区间控制的一种独立手段,区段边界随列车速度和质量的变化而变化。在区分交通运输能力发展措施和基础设施改善方案的基础上,确定了现有、估计、计划和需要的交通运输能力的特点。作者提出了折衷管理的问题,以确保所需的货运量和客运量,在一定数量的基础设施建设和维修工作的重建工作,以保持所需的准备程度。提出了在基础设施和调度资源枯竭的情况下,对运输过程不均匀影响的重建、技术、组织、技术和复杂措施的分类。讨论与结论。开发的解决方案能够提高复杂项目的可行性和效率,以发展交通和运输能力,并采取措施改善铁路网多边形的运营。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Assessment of transportation capacity balance of railway network polygons
Introduction. Traffic and transportation capacities of railway polygons and traffic flows are not constant throughout the year. Permissible capacity levels are determined by the condition of unhindered reception of trains by stations. It is necessary to calculate the balance of transportation capacity, making it possible to combine growing traffic with high rates with infrastructure development and repair works. The purpose of the study is to develop methodological solutions for assessing the balance of the railway transportation capacity and substantiating the procedure for implementing infrastructure measures in the context of the growing dynamics of the originating traffic and the tight deadlines for repairing and reconstructing the infrastructure.Materials and methods. The developed solutions are based on the data of the Russian Railways information systems, automated forecasting of the infrastructure and transportation resources of the railway network, and hybrid mathematical models.Results. The article presented the results of the substantiation of the normative restrictions on the daily time budget for the passage of trains, depending on the classification and specialisation of railway lines. The procedure for calculating the traffic capacity of sections with automatic locomotive signalling is determined as an independent means of interval control of train traffic with movable boundaries of block sections that change depending on the speed and mass of the train. The characteristics of the available, estimated, planned and required traffic and transportation capacities were determined with a distinction between measures for the development of traffic and transportation capacities and programs for improvement of infrastructure facilities. The authors put forward the problem of compromise management to ensure the required volumes of freight and passenger traffic, a given volume of reconstruction work on the development of infrastructure and repair work to maintain the required degree of its readiness. A classification of reconstructive, technological, organisational, technical and complex measures of influence on the unevenness of transport processes in the conditions of depletion of infrastructure and scheduling resources was presented.Discussion and conclusion. The developed solutions enable to increase the feasibility and efficiency of complex projects for the development of traffic and transportation capacities and measures to improve the operation of railway network polygons.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信