{"title":"离散制造中生产计划与控制的分布式体系结构","authors":"A. Villa","doi":"10.1109/CIM.1988.5430","DOIUrl":null,"url":null,"abstract":"The production management (PM) problems to be solved in a discrete manufacturing plant of large dimension are analyzed. Two separated approaches are discussed: the plant manager approach and the systems integrator approach. In the former, one states the PM objectives to be optimized; using the latter, one must suggest the mathematical formalizations of PM problems and the methods to solve them. A hierarchical decentralized architecture is outlined in which methods of integrating decision modules implementing PM problem-solution strategies are suggested. The practical problems concerning the total integration are presented.<<ETX>>","PeriodicalId":334994,"journal":{"name":"[Proceedings] 1988 International Conference on Computer Integrated Manufacturing","volume":"94 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1988-05-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Distributed architecture for production planning and control in discrete manufacturing\",\"authors\":\"A. Villa\",\"doi\":\"10.1109/CIM.1988.5430\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The production management (PM) problems to be solved in a discrete manufacturing plant of large dimension are analyzed. Two separated approaches are discussed: the plant manager approach and the systems integrator approach. In the former, one states the PM objectives to be optimized; using the latter, one must suggest the mathematical formalizations of PM problems and the methods to solve them. A hierarchical decentralized architecture is outlined in which methods of integrating decision modules implementing PM problem-solution strategies are suggested. The practical problems concerning the total integration are presented.<<ETX>>\",\"PeriodicalId\":334994,\"journal\":{\"name\":\"[Proceedings] 1988 International Conference on Computer Integrated Manufacturing\",\"volume\":\"94 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1988-05-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"[Proceedings] 1988 International Conference on Computer Integrated Manufacturing\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CIM.1988.5430\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"[Proceedings] 1988 International Conference on Computer Integrated Manufacturing","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CIM.1988.5430","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Distributed architecture for production planning and control in discrete manufacturing
The production management (PM) problems to be solved in a discrete manufacturing plant of large dimension are analyzed. Two separated approaches are discussed: the plant manager approach and the systems integrator approach. In the former, one states the PM objectives to be optimized; using the latter, one must suggest the mathematical formalizations of PM problems and the methods to solve them. A hierarchical decentralized architecture is outlined in which methods of integrating decision modules implementing PM problem-solution strategies are suggested. The practical problems concerning the total integration are presented.<>