大型离网抽水光伏系统的建模与性能评估

Miguel Pozuelo Monfort, Sergio López Oña, D. Ribó-Pérez, S. Djokic
{"title":"大型离网抽水光伏系统的建模与性能评估","authors":"Miguel Pozuelo Monfort, Sergio López Oña, D. Ribó-Pérez, S. Djokic","doi":"10.1109/ISGTEurope.2018.8571858","DOIUrl":null,"url":null,"abstract":"This paper discusses modelling of photovoltaic pumping system (PVPS) applications and presents a simple but accurate model for the evaluation of performance of a large-scale multi-pump off-grid PVPS’, with single axis solar tracking and variable frequency drive control of pumps. The presented model is validated on an example of an actual 357 kWp 2-pump PVPS installation, demonstrating its use for feasibility and planning studies. The results of a brief economic analysis of the considered off-grid PVPS suggest an estimated 10-year payback period, when compared to the cost of a grid-connected configuration.","PeriodicalId":302863,"journal":{"name":"2018 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT-Europe)","volume":"63 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Modelling and Evaluating Performance of Large Off-Grid PV Systems for Water Pumping\",\"authors\":\"Miguel Pozuelo Monfort, Sergio López Oña, D. Ribó-Pérez, S. Djokic\",\"doi\":\"10.1109/ISGTEurope.2018.8571858\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper discusses modelling of photovoltaic pumping system (PVPS) applications and presents a simple but accurate model for the evaluation of performance of a large-scale multi-pump off-grid PVPS’, with single axis solar tracking and variable frequency drive control of pumps. The presented model is validated on an example of an actual 357 kWp 2-pump PVPS installation, demonstrating its use for feasibility and planning studies. The results of a brief economic analysis of the considered off-grid PVPS suggest an estimated 10-year payback period, when compared to the cost of a grid-connected configuration.\",\"PeriodicalId\":302863,\"journal\":{\"name\":\"2018 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT-Europe)\",\"volume\":\"63 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT-Europe)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISGTEurope.2018.8571858\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT-Europe)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISGTEurope.2018.8571858","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

本文讨论了光伏泵系统应用的建模问题,提出了一种简单而准确的大型多泵离网光伏泵系统性能评估模型,该模型具有单轴太阳能跟踪和泵的变频驱动控制。该模型在357 kWp双泵PVPS安装实例中得到了验证,证明了其在可行性和规划研究中的应用。与并网配置的成本相比,对考虑的离网pv的简要经济分析结果表明,预计投资回收期为10年。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Modelling and Evaluating Performance of Large Off-Grid PV Systems for Water Pumping
This paper discusses modelling of photovoltaic pumping system (PVPS) applications and presents a simple but accurate model for the evaluation of performance of a large-scale multi-pump off-grid PVPS’, with single axis solar tracking and variable frequency drive control of pumps. The presented model is validated on an example of an actual 357 kWp 2-pump PVPS installation, demonstrating its use for feasibility and planning studies. The results of a brief economic analysis of the considered off-grid PVPS suggest an estimated 10-year payback period, when compared to the cost of a grid-connected configuration.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信