{"title":"印度的第十二次计划(2011/ 12 - 2016/ 17)增加容量- 88,500兆瓦","authors":"S. Pun","doi":"10.3126/HN.V17I0.13266","DOIUrl":null,"url":null,"abstract":"Not Available. HYDRO Nepal Journal Journal of Water, Energy and Environment Issue: 17, July 2015","PeriodicalId":117617,"journal":{"name":"Hydro Nepal: Journal of Water, Energy and Environment","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-08-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"India’s XIIth Plan (2011/’12 – 2016/’17) on Capacity Addition - 88,500 Megawatt\",\"authors\":\"S. Pun\",\"doi\":\"10.3126/HN.V17I0.13266\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Not Available. HYDRO Nepal Journal Journal of Water, Energy and Environment Issue: 17, July 2015\",\"PeriodicalId\":117617,\"journal\":{\"name\":\"Hydro Nepal: Journal of Water, Energy and Environment\",\"volume\":\"17 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-08-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Hydro Nepal: Journal of Water, Energy and Environment\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3126/HN.V17I0.13266\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hydro Nepal: Journal of Water, Energy and Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3126/HN.V17I0.13266","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}