基于人口增长的电力变压器负荷估算——以库伦县为例

Yudhi Ardiyanto, Slamet Suripto, F. Mujaahid, Rohman Try Anshori, Y. Jusman, Fardhan Arkan
{"title":"基于人口增长的电力变压器负荷估算——以库伦县为例","authors":"Yudhi Ardiyanto, Slamet Suripto, F. Mujaahid, Rohman Try Anshori, Y. Jusman, Fardhan Arkan","doi":"10.18196/jet.3465","DOIUrl":null,"url":null,"abstract":"Along with technological advances, it is estimated that the gross regional domestic product (GRDP) of Kulon Progo Regency increases annually by 7.6%, and the population growth of Kulon Progo regency increases annually by 0.9%. However, after assuming with Muara Bungo Regency as a reference to GRDP growth and Population of Kulon Progo Regency due to the influence of the Establishment of New Yogyakarta International Airport (NYIA) in 2019, the population growth every year is 15.78%. While GRDP in 2018 until 2019 equals to 82.91% and next year equals to 7.6 %. Load forecasting the burden for the next ten years by using multiple linear regression affected by NYIA in 2019, the loading of the 150 kV Wates substation is only up to 2021 for the power transformer I of 24.83 MW and the power transformer II 55.40 MW. So it is estimated that for 2022, power transformer I and power transformer II of 150 kV Wates Substation are no longer able to serve the loading. Then, in 2021 a feeder shift and uprating power transformer I need to be conducted. In 2024 a power transformer III is needed. In that year the feed formation from power transformer I and power transformer II was changed to power transformer III.","PeriodicalId":402105,"journal":{"name":"Journal of Electrical Technology UMY","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-12-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Estimation of Power Transformer Loading Based on Population Growth: A Case Study in Kulon Progo Regency\",\"authors\":\"Yudhi Ardiyanto, Slamet Suripto, F. Mujaahid, Rohman Try Anshori, Y. Jusman, Fardhan Arkan\",\"doi\":\"10.18196/jet.3465\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Along with technological advances, it is estimated that the gross regional domestic product (GRDP) of Kulon Progo Regency increases annually by 7.6%, and the population growth of Kulon Progo regency increases annually by 0.9%. However, after assuming with Muara Bungo Regency as a reference to GRDP growth and Population of Kulon Progo Regency due to the influence of the Establishment of New Yogyakarta International Airport (NYIA) in 2019, the population growth every year is 15.78%. While GRDP in 2018 until 2019 equals to 82.91% and next year equals to 7.6 %. Load forecasting the burden for the next ten years by using multiple linear regression affected by NYIA in 2019, the loading of the 150 kV Wates substation is only up to 2021 for the power transformer I of 24.83 MW and the power transformer II 55.40 MW. So it is estimated that for 2022, power transformer I and power transformer II of 150 kV Wates Substation are no longer able to serve the loading. Then, in 2021 a feeder shift and uprating power transformer I need to be conducted. In 2024 a power transformer III is needed. In that year the feed formation from power transformer I and power transformer II was changed to power transformer III.\",\"PeriodicalId\":402105,\"journal\":{\"name\":\"Journal of Electrical Technology UMY\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-12-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Electrical Technology UMY\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.18196/jet.3465\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Electrical Technology UMY","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18196/jet.3465","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

随着科技的进步,库隆普罗戈县的地区生产总值(GRDP)预计每年增长7.6%,库隆普罗戈县的人口增长率每年增长0.9%。然而,在2019年新日惹国际机场(NYIA)建立的影响下,以Muara Bungo Regency作为GRDP增长和Kulon Progo Regency人口增长的参考,每年的人口增长为15.78%。而2018年至2019年的gdp为82.91%,明年为7.6%。2019年受NYIA影响的多元线性回归预测未来十年负荷,150 kV瓦特变电站至2021年的负荷仅为电力变压器I为24.83 MW,电力变压器II为55.40 MW。因此,预计到2022年,150kv瓦特变电站的电力变压器1、电力变压器2将无法再为负荷服务。然后,在2021年,需要进行馈线移位和升级电力变压器1。2024年需要一个电力变压器III。当年电力变压器1和电力变压器2的馈电形成改为电力变压器3。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Estimation of Power Transformer Loading Based on Population Growth: A Case Study in Kulon Progo Regency
Along with technological advances, it is estimated that the gross regional domestic product (GRDP) of Kulon Progo Regency increases annually by 7.6%, and the population growth of Kulon Progo regency increases annually by 0.9%. However, after assuming with Muara Bungo Regency as a reference to GRDP growth and Population of Kulon Progo Regency due to the influence of the Establishment of New Yogyakarta International Airport (NYIA) in 2019, the population growth every year is 15.78%. While GRDP in 2018 until 2019 equals to 82.91% and next year equals to 7.6 %. Load forecasting the burden for the next ten years by using multiple linear regression affected by NYIA in 2019, the loading of the 150 kV Wates substation is only up to 2021 for the power transformer I of 24.83 MW and the power transformer II 55.40 MW. So it is estimated that for 2022, power transformer I and power transformer II of 150 kV Wates Substation are no longer able to serve the loading. Then, in 2021 a feeder shift and uprating power transformer I need to be conducted. In 2024 a power transformer III is needed. In that year the feed formation from power transformer I and power transformer II was changed to power transformer III.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信