{"title":"Lentera Bumi Nusantara水电站可再生能源混合电网系统自动转换开关设计","authors":"M. Abdillah, Tri Mutia, Teguh Aryo Nugroho, Nita Indriani Pertiwi","doi":"10.20473/jatm.v1i2.40293","DOIUrl":null,"url":null,"abstract":"\nCurrently, the transition between renewable energy sources and PLN sources at PT LBN is done manually by conducting scheduled monitoring. However, this method is less efficient and depends on the readiness of the operator. Therefore, in this Final Project, the design and construction of an Automatic Transfer Switch (ATS) on a renewable energy hybrid grid system at PT LBN is carried out where the source switching is based on the battery voltage value so as to shorten the source switching time while protecting the battery from undervoltage conditions. The main components used in the construction of this ATS system are contactors, relays, relay control circuits, ESP32, LCD 1604, and voltage divider circuits. The result of this final project is an ATS system that has a voltage sensor error of 0 - 1.187%. The monitoring of the ATS system was also successfully accessed from near and remotely in real time. The ATS that was built has a faster source switching time than the manual method, which is 21.6 ms - 40.1 ms. \n","PeriodicalId":384259,"journal":{"name":"Journal of Advanced Technology and Multidiscipline","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Design of Automatic Transfer Switch on A Renewable Energy Hybrid Grid System at PT Lentera Bumi Nusantara\",\"authors\":\"M. Abdillah, Tri Mutia, Teguh Aryo Nugroho, Nita Indriani Pertiwi\",\"doi\":\"10.20473/jatm.v1i2.40293\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\nCurrently, the transition between renewable energy sources and PLN sources at PT LBN is done manually by conducting scheduled monitoring. However, this method is less efficient and depends on the readiness of the operator. Therefore, in this Final Project, the design and construction of an Automatic Transfer Switch (ATS) on a renewable energy hybrid grid system at PT LBN is carried out where the source switching is based on the battery voltage value so as to shorten the source switching time while protecting the battery from undervoltage conditions. The main components used in the construction of this ATS system are contactors, relays, relay control circuits, ESP32, LCD 1604, and voltage divider circuits. The result of this final project is an ATS system that has a voltage sensor error of 0 - 1.187%. The monitoring of the ATS system was also successfully accessed from near and remotely in real time. The ATS that was built has a faster source switching time than the manual method, which is 21.6 ms - 40.1 ms. \\n\",\"PeriodicalId\":384259,\"journal\":{\"name\":\"Journal of Advanced Technology and Multidiscipline\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-11-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Advanced Technology and Multidiscipline\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.20473/jatm.v1i2.40293\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Advanced Technology and Multidiscipline","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.20473/jatm.v1i2.40293","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

目前,PT LBN的可再生能源和PLN能源之间的转换是通过定期监测手动完成的。然而,这种方法效率较低,而且取决于操作者的准备程度。因此,在本次Final Project中,在PT LBN可再生能源混合电网系统上设计并构建自动转换开关(ATS),根据电池电压值进行电源切换,以缩短电源切换时间,同时保护电池免受欠压情况的影响。该ATS系统主要由接触器、继电器、继电器控制电路、ESP32、LCD 1604、分压器电路等组成。最终设计的ATS系统电压传感器误差为0 ~ 1.187%。ATS系统的监控也成功实现了近距离和远程实时接入。所构建的ATS具有比手动方法更快的源切换时间,为21.6 ms - 40.1 ms。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Design of Automatic Transfer Switch on A Renewable Energy Hybrid Grid System at PT Lentera Bumi Nusantara
Currently, the transition between renewable energy sources and PLN sources at PT LBN is done manually by conducting scheduled monitoring. However, this method is less efficient and depends on the readiness of the operator. Therefore, in this Final Project, the design and construction of an Automatic Transfer Switch (ATS) on a renewable energy hybrid grid system at PT LBN is carried out where the source switching is based on the battery voltage value so as to shorten the source switching time while protecting the battery from undervoltage conditions. The main components used in the construction of this ATS system are contactors, relays, relay control circuits, ESP32, LCD 1604, and voltage divider circuits. The result of this final project is an ATS system that has a voltage sensor error of 0 - 1.187%. The monitoring of the ATS system was also successfully accessed from near and remotely in real time. The ATS that was built has a faster source switching time than the manual method, which is 21.6 ms - 40.1 ms.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信