{"title":"汞填充沉降计","authors":"T. Hopkins, R. Deen","doi":"10.13023/KTC.RR.1972.351","DOIUrl":null,"url":null,"abstract":"A DESCRIPTION IS GIVEN OF A REMOTE-SENSING, MULTIPLE-POINT, MERCURY-FILLED SETTLEMENT GAUGE DESIGNED FOR MEASURING IN-PLACE SETTLEMENTS. THE GAUGE CONSISTS OF SETTLEMENT UNITS POSITIONED AT LOCATIONS WHERE SETTLEMENT MEASUREMENTS ARE DESIRED AND A MONITORING UNIT LOCATED OUTSIDE OF CONSTRUCTION LIMITS. SETTLEMENT READINGS ARE OBSERVED ON A MERCURY MANOMETER LOCATED AT THE MONITORING SITE AND ARE EQUAL TO THE DIFFERENCES IN INITIAL AND SUBSEQUENT PRESSURE-HEAD READINGS. COMPARISONS OF MEASUREMENTS OBTAINED AT HIGHWAY CONSTRUCTION SITE FROM MERCURY GAUGE SETTLEMENT UNITS AND CONVENTIONAL SETTLEMENT PLATFORMS ARE PRESENTED AND SHOW VERY GOOD AGREEMENT. WITH THE MERCURY GAUGE, A LARGE AMOUNT OF SETTLEMENT INFORMATION CAN BE OBTAINED PER INSTALLATION, AND THE GAUGE DOE NOT HAVE MANY OF THE DISADVANTAGES ASSOCIATED WITH THE SETTLEMENT PLATFORM.","PeriodicalId":202069,"journal":{"name":"Highway Research Record","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"MERCURY-FILLED SETTLEMENT GAUGE\",\"authors\":\"T. Hopkins, R. Deen\",\"doi\":\"10.13023/KTC.RR.1972.351\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A DESCRIPTION IS GIVEN OF A REMOTE-SENSING, MULTIPLE-POINT, MERCURY-FILLED SETTLEMENT GAUGE DESIGNED FOR MEASURING IN-PLACE SETTLEMENTS. THE GAUGE CONSISTS OF SETTLEMENT UNITS POSITIONED AT LOCATIONS WHERE SETTLEMENT MEASUREMENTS ARE DESIRED AND A MONITORING UNIT LOCATED OUTSIDE OF CONSTRUCTION LIMITS. SETTLEMENT READINGS ARE OBSERVED ON A MERCURY MANOMETER LOCATED AT THE MONITORING SITE AND ARE EQUAL TO THE DIFFERENCES IN INITIAL AND SUBSEQUENT PRESSURE-HEAD READINGS. COMPARISONS OF MEASUREMENTS OBTAINED AT HIGHWAY CONSTRUCTION SITE FROM MERCURY GAUGE SETTLEMENT UNITS AND CONVENTIONAL SETTLEMENT PLATFORMS ARE PRESENTED AND SHOW VERY GOOD AGREEMENT. WITH THE MERCURY GAUGE, A LARGE AMOUNT OF SETTLEMENT INFORMATION CAN BE OBTAINED PER INSTALLATION, AND THE GAUGE DOE NOT HAVE MANY OF THE DISADVANTAGES ASSOCIATED WITH THE SETTLEMENT PLATFORM.\",\"PeriodicalId\":202069,\"journal\":{\"name\":\"Highway Research Record\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Highway Research Record\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.13023/KTC.RR.1972.351\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Highway Research Record","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.13023/KTC.RR.1972.351","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A DESCRIPTION IS GIVEN OF A REMOTE-SENSING, MULTIPLE-POINT, MERCURY-FILLED SETTLEMENT GAUGE DESIGNED FOR MEASURING IN-PLACE SETTLEMENTS. THE GAUGE CONSISTS OF SETTLEMENT UNITS POSITIONED AT LOCATIONS WHERE SETTLEMENT MEASUREMENTS ARE DESIRED AND A MONITORING UNIT LOCATED OUTSIDE OF CONSTRUCTION LIMITS. SETTLEMENT READINGS ARE OBSERVED ON A MERCURY MANOMETER LOCATED AT THE MONITORING SITE AND ARE EQUAL TO THE DIFFERENCES IN INITIAL AND SUBSEQUENT PRESSURE-HEAD READINGS. COMPARISONS OF MEASUREMENTS OBTAINED AT HIGHWAY CONSTRUCTION SITE FROM MERCURY GAUGE SETTLEMENT UNITS AND CONVENTIONAL SETTLEMENT PLATFORMS ARE PRESENTED AND SHOW VERY GOOD AGREEMENT. WITH THE MERCURY GAUGE, A LARGE AMOUNT OF SETTLEMENT INFORMATION CAN BE OBTAINED PER INSTALLATION, AND THE GAUGE DOE NOT HAVE MANY OF THE DISADVANTAGES ASSOCIATED WITH THE SETTLEMENT PLATFORM.