{"title":"汞填充沉降计","authors":"T. Hopkins, R. Deen","doi":"10.13023/KTC.RR.1972.351","DOIUrl":null,"url":null,"abstract":"A DESCRIPTION IS GIVEN OF A REMOTE-SENSING, MULTIPLE-POINT, MERCURY-FILLED SETTLEMENT GAUGE DESIGNED FOR MEASURING IN-PLACE SETTLEMENTS. THE GAUGE CONSISTS OF SETTLEMENT UNITS POSITIONED AT LOCATIONS WHERE SETTLEMENT MEASUREMENTS ARE DESIRED AND A MONITORING UNIT LOCATED OUTSIDE OF CONSTRUCTION LIMITS. SETTLEMENT READINGS ARE OBSERVED ON A MERCURY MANOMETER LOCATED AT THE MONITORING SITE AND ARE EQUAL TO THE DIFFERENCES IN INITIAL AND SUBSEQUENT PRESSURE-HEAD READINGS. COMPARISONS OF MEASUREMENTS OBTAINED AT HIGHWAY CONSTRUCTION SITE FROM MERCURY GAUGE SETTLEMENT UNITS AND CONVENTIONAL SETTLEMENT PLATFORMS ARE PRESENTED AND SHOW VERY GOOD AGREEMENT. WITH THE MERCURY GAUGE, A LARGE AMOUNT OF SETTLEMENT INFORMATION CAN BE OBTAINED PER INSTALLATION, AND THE GAUGE DOE NOT HAVE MANY OF THE DISADVANTAGES ASSOCIATED WITH THE SETTLEMENT PLATFORM.","PeriodicalId":202069,"journal":{"name":"Highway Research Record","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"MERCURY-FILLED SETTLEMENT GAUGE\",\"authors\":\"T. Hopkins, R. Deen\",\"doi\":\"10.13023/KTC.RR.1972.351\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A DESCRIPTION IS GIVEN OF A REMOTE-SENSING, MULTIPLE-POINT, MERCURY-FILLED SETTLEMENT GAUGE DESIGNED FOR MEASURING IN-PLACE SETTLEMENTS. THE GAUGE CONSISTS OF SETTLEMENT UNITS POSITIONED AT LOCATIONS WHERE SETTLEMENT MEASUREMENTS ARE DESIRED AND A MONITORING UNIT LOCATED OUTSIDE OF CONSTRUCTION LIMITS. SETTLEMENT READINGS ARE OBSERVED ON A MERCURY MANOMETER LOCATED AT THE MONITORING SITE AND ARE EQUAL TO THE DIFFERENCES IN INITIAL AND SUBSEQUENT PRESSURE-HEAD READINGS. COMPARISONS OF MEASUREMENTS OBTAINED AT HIGHWAY CONSTRUCTION SITE FROM MERCURY GAUGE SETTLEMENT UNITS AND CONVENTIONAL SETTLEMENT PLATFORMS ARE PRESENTED AND SHOW VERY GOOD AGREEMENT. WITH THE MERCURY GAUGE, A LARGE AMOUNT OF SETTLEMENT INFORMATION CAN BE OBTAINED PER INSTALLATION, AND THE GAUGE DOE NOT HAVE MANY OF THE DISADVANTAGES ASSOCIATED WITH THE SETTLEMENT PLATFORM.\",\"PeriodicalId\":202069,\"journal\":{\"name\":\"Highway Research Record\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Highway Research Record\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.13023/KTC.RR.1972.351\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Highway Research Record","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.13023/KTC.RR.1972.351","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

介绍了一种用于测量现场沉降的遥感多点充汞沉降计。该仪表由位于需要测量沉降的位置的沉降单元和位于施工限制之外的监测单元组成。沉降读数是在监测点的水银压力计上观察到的,等于初始和后续压力头读数的差值。对公路施工现场汞计沉降单元与常规沉降平台测量结果进行了比较,结果吻合较好。使用汞表,每次安装都可以获得大量的沉降信息,而且汞表没有沉降平台的许多缺点。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
MERCURY-FILLED SETTLEMENT GAUGE
A DESCRIPTION IS GIVEN OF A REMOTE-SENSING, MULTIPLE-POINT, MERCURY-FILLED SETTLEMENT GAUGE DESIGNED FOR MEASURING IN-PLACE SETTLEMENTS. THE GAUGE CONSISTS OF SETTLEMENT UNITS POSITIONED AT LOCATIONS WHERE SETTLEMENT MEASUREMENTS ARE DESIRED AND A MONITORING UNIT LOCATED OUTSIDE OF CONSTRUCTION LIMITS. SETTLEMENT READINGS ARE OBSERVED ON A MERCURY MANOMETER LOCATED AT THE MONITORING SITE AND ARE EQUAL TO THE DIFFERENCES IN INITIAL AND SUBSEQUENT PRESSURE-HEAD READINGS. COMPARISONS OF MEASUREMENTS OBTAINED AT HIGHWAY CONSTRUCTION SITE FROM MERCURY GAUGE SETTLEMENT UNITS AND CONVENTIONAL SETTLEMENT PLATFORMS ARE PRESENTED AND SHOW VERY GOOD AGREEMENT. WITH THE MERCURY GAUGE, A LARGE AMOUNT OF SETTLEMENT INFORMATION CAN BE OBTAINED PER INSTALLATION, AND THE GAUGE DOE NOT HAVE MANY OF THE DISADVANTAGES ASSOCIATED WITH THE SETTLEMENT PLATFORM.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信