T. Kunifuji, H. Ito, Yoshinori Saiki, M. Matsumoto
{"title":"提出了安全相关实时系统中安全、可靠、灵活并存技术及其在铁路信号系统中的实际应用","authors":"T. Kunifuji, H. Ito, Yoshinori Saiki, M. Matsumoto","doi":"10.1109/ESARS.2010.5665257","DOIUrl":null,"url":null,"abstract":"Recently amount of construction about railway signalling system is steadily increasing to improve the transport services for the customer. But, at present efficiency of signal construction is very low. For example it is caused by that the period for the construction is limited to very short time at midnight or flexibility of the signalling system is low from its system architecture. To solve this problem we are now grappling the innovation of the railway signalling system. In this paper, coexistence technology of safety, reliability and flexibility in safety related real-time system and safety evaluation in practical system is discussed.","PeriodicalId":134406,"journal":{"name":"Electrical Systems for Aircraft, Railway and Ship Propulsion","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Proposal of coexistence technology of safety, reliability and flexibility in safety related real-time system and practical use to railway signalling system\",\"authors\":\"T. Kunifuji, H. Ito, Yoshinori Saiki, M. Matsumoto\",\"doi\":\"10.1109/ESARS.2010.5665257\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Recently amount of construction about railway signalling system is steadily increasing to improve the transport services for the customer. But, at present efficiency of signal construction is very low. For example it is caused by that the period for the construction is limited to very short time at midnight or flexibility of the signalling system is low from its system architecture. To solve this problem we are now grappling the innovation of the railway signalling system. In this paper, coexistence technology of safety, reliability and flexibility in safety related real-time system and safety evaluation in practical system is discussed.\",\"PeriodicalId\":134406,\"journal\":{\"name\":\"Electrical Systems for Aircraft, Railway and Ship Propulsion\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-12-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Electrical Systems for Aircraft, Railway and Ship Propulsion\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ESARS.2010.5665257\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Electrical Systems for Aircraft, Railway and Ship Propulsion","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ESARS.2010.5665257","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Proposal of coexistence technology of safety, reliability and flexibility in safety related real-time system and practical use to railway signalling system
Recently amount of construction about railway signalling system is steadily increasing to improve the transport services for the customer. But, at present efficiency of signal construction is very low. For example it is caused by that the period for the construction is limited to very short time at midnight or flexibility of the signalling system is low from its system architecture. To solve this problem we are now grappling the innovation of the railway signalling system. In this paper, coexistence technology of safety, reliability and flexibility in safety related real-time system and safety evaluation in practical system is discussed.