拉格朗日方法下的发电最优经济调度

M. Marwan, Muhammad Dihyah Marwan, M. Anshar, J. Jamal, Aksan Aksan, A. Apollo
{"title":"拉格朗日方法下的发电最优经济调度","authors":"M. Marwan, Muhammad Dihyah Marwan, M. Anshar, J. Jamal, Aksan Aksan, A. Apollo","doi":"10.1109/AIMS52415.2021.9466034","DOIUrl":null,"url":null,"abstract":"The goal of this research to optimize economic dispatch for power generation on the electrical system. In this research there are two kinds of power generation installed on the electrical power system: $2\\times 50\\ \\text{MW}$. The total load and cost for generators-1 and 2 are: 41.63 MW (23,489,069.25 IDR/h) and 41.73 MW (21,291,609.38 IDR/h), respectively. To define optimum cost for both generations, the Lagrange method was applied to compute total cost for every generator considering the electricity demand. Based on the results of research illustrated, the total load and cost for generation-1 and 2 can be optimized to be 43.41 MW (24,540,714 IDR/h) and 39.95 MW (20,221,493), respectively. This indicates that the Lagrange method is an effective way to reduce the total cost of generation. The total cost reduction can be achieved to be 31,205 IDR/h.","PeriodicalId":299121,"journal":{"name":"2021 International Conference on Artificial Intelligence and Mechatronics Systems (AIMS)","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Optimal economic dispatch for power generation under the lagrange method\",\"authors\":\"M. Marwan, Muhammad Dihyah Marwan, M. Anshar, J. Jamal, Aksan Aksan, A. Apollo\",\"doi\":\"10.1109/AIMS52415.2021.9466034\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The goal of this research to optimize economic dispatch for power generation on the electrical system. In this research there are two kinds of power generation installed on the electrical power system: $2\\\\times 50\\\\ \\\\text{MW}$. The total load and cost for generators-1 and 2 are: 41.63 MW (23,489,069.25 IDR/h) and 41.73 MW (21,291,609.38 IDR/h), respectively. To define optimum cost for both generations, the Lagrange method was applied to compute total cost for every generator considering the electricity demand. Based on the results of research illustrated, the total load and cost for generation-1 and 2 can be optimized to be 43.41 MW (24,540,714 IDR/h) and 39.95 MW (20,221,493), respectively. This indicates that the Lagrange method is an effective way to reduce the total cost of generation. The total cost reduction can be achieved to be 31,205 IDR/h.\",\"PeriodicalId\":299121,\"journal\":{\"name\":\"2021 International Conference on Artificial Intelligence and Mechatronics Systems (AIMS)\",\"volume\":\"45 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-04-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 International Conference on Artificial Intelligence and Mechatronics Systems (AIMS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AIMS52415.2021.9466034\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 International Conference on Artificial Intelligence and Mechatronics Systems (AIMS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AIMS52415.2021.9466034","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本研究的目标是优化电力系统的发电经济调度。在本研究中有两种发电方式安装在电力系统上:$2\ × 50\ \text{MW}$。1号和2号机组的总负荷和成本分别为:41.63 MW (23,489,069.25 IDR/h)和41.73 MW (21,291,609.38 IDR/h)。为了确定两代发电机的最优成本,在考虑电力需求的情况下,应用拉格朗日方法计算每台发电机的总成本。研究结果表明,优化后的1、2发电机组总负荷和总成本分别为43.41 MW (24,540,714 IDR/h)和39.95 MW(20,221,493)。这表明拉格朗日方法是降低发电总成本的有效方法。总成本可降低31205 IDR/h。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimal economic dispatch for power generation under the lagrange method
The goal of this research to optimize economic dispatch for power generation on the electrical system. In this research there are two kinds of power generation installed on the electrical power system: $2\times 50\ \text{MW}$. The total load and cost for generators-1 and 2 are: 41.63 MW (23,489,069.25 IDR/h) and 41.73 MW (21,291,609.38 IDR/h), respectively. To define optimum cost for both generations, the Lagrange method was applied to compute total cost for every generator considering the electricity demand. Based on the results of research illustrated, the total load and cost for generation-1 and 2 can be optimized to be 43.41 MW (24,540,714 IDR/h) and 39.95 MW (20,221,493), respectively. This indicates that the Lagrange method is an effective way to reduce the total cost of generation. The total cost reduction can be achieved to be 31,205 IDR/h.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信