{"title":"短期调度与MRP-II系统的集成:工业实施","authors":"Serge Bourgeois, A. Artiba, C. Tahon","doi":"10.1109/IECON.1993.339189","DOIUrl":null,"url":null,"abstract":"This paper presents the implementation of a short term scheduling system developed in the scope of the Eureka Paradi-European research program-at Techspace Aero. We first introduce the context which pushes the industrial partner to decentralize the production management and to look for a short term scheduling system. The approach and the results are presented. We then deal with the integration aspects. The existing MRP-II system is in charge of the long- and medium-term planning which are complementary to the new short term scheduling system. We also highlight the main functions of the finite capacity scheduling tool as well as the constraints taken into account. We then give a demonstrative example to illustrate the dynamic group technology feature, allowing a substantial reduction of the machine setup procedure. We then conclude with the industrial impact of the new scheduling system.<<ETX>>","PeriodicalId":132101,"journal":{"name":"Proceedings of IECON '93 - 19th Annual Conference of IEEE Industrial Electronics","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-11-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Integration of short term scheduling with a MRP-II system: industrial implementation\",\"authors\":\"Serge Bourgeois, A. Artiba, C. Tahon\",\"doi\":\"10.1109/IECON.1993.339189\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents the implementation of a short term scheduling system developed in the scope of the Eureka Paradi-European research program-at Techspace Aero. We first introduce the context which pushes the industrial partner to decentralize the production management and to look for a short term scheduling system. The approach and the results are presented. We then deal with the integration aspects. The existing MRP-II system is in charge of the long- and medium-term planning which are complementary to the new short term scheduling system. We also highlight the main functions of the finite capacity scheduling tool as well as the constraints taken into account. We then give a demonstrative example to illustrate the dynamic group technology feature, allowing a substantial reduction of the machine setup procedure. We then conclude with the industrial impact of the new scheduling system.<<ETX>>\",\"PeriodicalId\":132101,\"journal\":{\"name\":\"Proceedings of IECON '93 - 19th Annual Conference of IEEE Industrial Electronics\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1993-11-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of IECON '93 - 19th Annual Conference of IEEE Industrial Electronics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IECON.1993.339189\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of IECON '93 - 19th Annual Conference of IEEE Industrial Electronics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IECON.1993.339189","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文介绍了一种短期调度系统的实现,该系统是在欧洲研究项目Eureka paradi的范围内开发的。我们首先介绍了推动工业合作伙伴分散生产管理和寻找短期调度系统的背景。最后给出了方法和结果。然后我们处理集成方面的问题。现有的MRP-II系统负责长期和中期计划,这是对新的短期调度系统的补充。我们还强调了有限容量调度工具的主要功能以及所考虑的约束。然后,我们给出一个示范示例来说明动态组技术的特点,允许大幅度减少机器设置过程。然后,我们总结了新的调度系统对工业的影响
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Integration of short term scheduling with a MRP-II system: industrial implementation
This paper presents the implementation of a short term scheduling system developed in the scope of the Eureka Paradi-European research program-at Techspace Aero. We first introduce the context which pushes the industrial partner to decentralize the production management and to look for a short term scheduling system. The approach and the results are presented. We then deal with the integration aspects. The existing MRP-II system is in charge of the long- and medium-term planning which are complementary to the new short term scheduling system. We also highlight the main functions of the finite capacity scheduling tool as well as the constraints taken into account. We then give a demonstrative example to illustrate the dynamic group technology feature, allowing a substantial reduction of the machine setup procedure. We then conclude with the industrial impact of the new scheduling system.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信