首先设计它——在你测试它之前!

A. Apostolov, B. Vandiver
{"title":"首先设计它——在你测试它之前!","authors":"A. Apostolov, B. Vandiver","doi":"10.1109/CPRE.2013.6822052","DOIUrl":null,"url":null,"abstract":"The paper discusses some of the engineering practices that have been used to design modern protection systems - most of which preclude the ability to field test them for either commissioning or routine testing requirements. This results in long term costs that far exceed the short term gain of the initial cost of the installed system. This paper makes specific recommendations to improve this “up front” engineering of the protection system so that field testing can be economically performed while easily meeting requirements of NERC/CIP documentation. Testing methods presented based on these engineering improvements provides long term cost reductions, operational improvements, and advantages in trouble shooting a protection scheme.","PeriodicalId":221348,"journal":{"name":"2013 66th Annual Conference for Protective Relay Engineers","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-04-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Engineer it first — Before you test it!\",\"authors\":\"A. Apostolov, B. Vandiver\",\"doi\":\"10.1109/CPRE.2013.6822052\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper discusses some of the engineering practices that have been used to design modern protection systems - most of which preclude the ability to field test them for either commissioning or routine testing requirements. This results in long term costs that far exceed the short term gain of the initial cost of the installed system. This paper makes specific recommendations to improve this “up front” engineering of the protection system so that field testing can be economically performed while easily meeting requirements of NERC/CIP documentation. Testing methods presented based on these engineering improvements provides long term cost reductions, operational improvements, and advantages in trouble shooting a protection scheme.\",\"PeriodicalId\":221348,\"journal\":{\"name\":\"2013 66th Annual Conference for Protective Relay Engineers\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-04-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 66th Annual Conference for Protective Relay Engineers\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CPRE.2013.6822052\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 66th Annual Conference for Protective Relay Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPRE.2013.6822052","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

本文讨论了一些用于设计现代保护系统的工程实践,其中大多数都排除了对它们进行现场测试的能力,无论是调试还是常规测试要求。这导致长期成本远远超过安装系统的初始成本的短期收益。本文提出了具体的建议,以改进这种“预先”工程的保护系统,使现场测试可以经济地进行,同时很容易满足NERC/CIP文件的要求。基于这些工程改进提出的测试方法提供了长期的成本降低、操作改进和故障排除保护方案的优势。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Engineer it first — Before you test it!
The paper discusses some of the engineering practices that have been used to design modern protection systems - most of which preclude the ability to field test them for either commissioning or routine testing requirements. This results in long term costs that far exceed the short term gain of the initial cost of the installed system. This paper makes specific recommendations to improve this “up front” engineering of the protection system so that field testing can be economically performed while easily meeting requirements of NERC/CIP documentation. Testing methods presented based on these engineering improvements provides long term cost reductions, operational improvements, and advantages in trouble shooting a protection scheme.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信