改善俄罗斯联邦建筑业定价的措施

E. Vasilyeva
{"title":"改善俄罗斯联邦建筑业定价的措施","authors":"E. Vasilyeva","doi":"10.33920/str-01-2202-01","DOIUrl":null,"url":null,"abstract":"Article contains the analysis of measures for the improvement of pricing in the construction industry of the Russian Federation, undertaken in 2016–2018 and 2019–2021. The problems, revealed during realization of reforms, are considered. The expected effects of the measures are designated. The assumptions, what steps would allow to carry out the transition to the resource method more effectively, are expressed.","PeriodicalId":339141,"journal":{"name":"Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)","volume":"77 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Measures for the improvement of pricing in the construction industry of the Russian Federation\",\"authors\":\"E. Vasilyeva\",\"doi\":\"10.33920/str-01-2202-01\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Article contains the analysis of measures for the improvement of pricing in the construction industry of the Russian Federation, undertaken in 2016–2018 and 2019–2021. The problems, revealed during realization of reforms, are considered. The expected effects of the measures are designated. The assumptions, what steps would allow to carry out the transition to the resource method more effectively, are expressed.\",\"PeriodicalId\":339141,\"journal\":{\"name\":\"Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)\",\"volume\":\"77 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-02-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33920/str-01-2202-01\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33920/str-01-2202-01","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

文章分析了2016-2018年和2019-2021年俄罗斯联邦建筑业价格改善措施。对改革实施过程中暴露出的问题进行了思考。指定了这些措施的预期效果。提出了一些假设,即哪些步骤可以更有效地实现向资源法的过渡。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Measures for the improvement of pricing in the construction industry of the Russian Federation
Article contains the analysis of measures for the improvement of pricing in the construction industry of the Russian Federation, undertaken in 2016–2018 and 2019–2021. The problems, revealed during realization of reforms, are considered. The expected effects of the measures are designated. The assumptions, what steps would allow to carry out the transition to the resource method more effectively, are expressed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信