{"title":"教育网络运营管理系统(ednet-oms)对泰国小型学校学习成果的改善——以北碧府班旺塔肯学校为例","authors":"Choochat Phuangsomjit","doi":"10.20472/iac.2020.054.018","DOIUrl":null,"url":null,"abstract":": Ban Wang Takian School is a small primary school under Kanchanaburi Primary Education Service Area Office 1 in Thailand. It has 93 students and 5 teachers. It is a school with the problem of having not enough teachers for its classrooms, since it has eight classrooms from Kindergarten II (second year kindergarten) to Prathom Suksa VI (Grade 6) levels. Learning achievement of Prathom Suksa VI students in the 2016 academic year, based on the Ordinary National Educational Test (O-NET) results, of five learning areas before implementing the Educational Network Operating Management System (EdNet-OMS) was at the 41.67 percent of the full score. Later on, the school director initiated the implementation of the Educational Network Operating Management System (EdNet-OMS) that was connected with the Distance Learning Television (DLTV) system of the Distance Education via Satellite Foundation under the Royal Patronage in order to utilize the benefits from DLTV up to its full potential. Then the initiation was complemented by the development of teachers to equip them with the ability and skills for learning management via the information technology system, and the creating of the cooperation network involving the parents and local community. As a result, the O-NET result of Prathom Suksa VI students in the 2017 academic year was increased to be at the 46.71 percent of the full score. The EdNet-OMS system was composed of the following five operational steps: (1) the creation of awareness step; (2) the development of the Educational Network Operating Management System (EdNet-OMS) step; (3) the empowerment step; (4) the monitoring and follow-up of the operation step; and (5) the evaluation step. The most important factor that enabled the operation to achieve success was the factor of the administrator with innovation leadership.","PeriodicalId":360141,"journal":{"name":"Proceedings of the 54th International Academic Virtual Conference, Prague","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"IMPROVEMENT OF LEARNING ACHIEVEMENT OF SMALL SCHOOLS IN THAILAND BY EDUCATIONAL NETWORK OPERATING MANAGEMENT SYSTEM (EDNET-OMS): A CASE STUDY OF BAN WANG TAKIAN SCHOOL IN KANCHANABURI PROVINCE\",\"authors\":\"Choochat Phuangsomjit\",\"doi\":\"10.20472/iac.2020.054.018\",\"DOIUrl\":null,\"url\":null,\"abstract\":\": Ban Wang Takian School is a small primary school under Kanchanaburi Primary Education Service Area Office 1 in Thailand. It has 93 students and 5 teachers. It is a school with the problem of having not enough teachers for its classrooms, since it has eight classrooms from Kindergarten II (second year kindergarten) to Prathom Suksa VI (Grade 6) levels. Learning achievement of Prathom Suksa VI students in the 2016 academic year, based on the Ordinary National Educational Test (O-NET) results, of five learning areas before implementing the Educational Network Operating Management System (EdNet-OMS) was at the 41.67 percent of the full score. Later on, the school director initiated the implementation of the Educational Network Operating Management System (EdNet-OMS) that was connected with the Distance Learning Television (DLTV) system of the Distance Education via Satellite Foundation under the Royal Patronage in order to utilize the benefits from DLTV up to its full potential. Then the initiation was complemented by the development of teachers to equip them with the ability and skills for learning management via the information technology system, and the creating of the cooperation network involving the parents and local community. As a result, the O-NET result of Prathom Suksa VI students in the 2017 academic year was increased to be at the 46.71 percent of the full score. The EdNet-OMS system was composed of the following five operational steps: (1) the creation of awareness step; (2) the development of the Educational Network Operating Management System (EdNet-OMS) step; (3) the empowerment step; (4) the monitoring and follow-up of the operation step; and (5) the evaluation step. The most important factor that enabled the operation to achieve success was the factor of the administrator with innovation leadership.\",\"PeriodicalId\":360141,\"journal\":{\"name\":\"Proceedings of the 54th International Academic Virtual Conference, Prague\",\"volume\":\"2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 54th International Academic Virtual Conference, Prague\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.20472/iac.2020.054.018\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 54th International Academic Virtual Conference, Prague","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.20472/iac.2020.054.018","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
Ban Wang Takian学校是泰国北碧府小学教育服务区第一办事处下的一所小型小学。现有学生93人,教师5人。这所学校的问题是教室没有足够的教师,因为它有8个教室,从幼儿园II(幼儿园二年级)到Prathom Suksa VI(六年级)。2016学年,在实施教育网络运营管理系统(EdNet-OMS)之前,Prathom Suksa VI学生的五个学习领域的学习成绩为满分的41.67%。基于普通国家教育测试(O-NET)成绩。随后,学校校长发起实施教育网运营管理系统(EdNet-OMS),该系统通过皇家赞助的卫星基金会与远程教育的远程学习电视(DLTV)系统相连,以充分利用DLTV的优势。然后,辅之以发展教师,使他们具备利用资讯科技系统管理学习的能力和技巧,以及建立家长和当地社区的合作网络。因此,2017学年Prathom Suksa六年级学生的O-NET成绩提高到满分的46.71%。EdNet-OMS系统由以下五个操作步骤组成:(1)创建感知步骤;(2)开发教育网络运营管理系统(EdNet-OMS)的步骤;(3)授权步骤;(4)操作步骤的监控与跟踪;(5)评价步骤。使运营取得成功的最重要因素是具有创新领导能力的管理者。
IMPROVEMENT OF LEARNING ACHIEVEMENT OF SMALL SCHOOLS IN THAILAND BY EDUCATIONAL NETWORK OPERATING MANAGEMENT SYSTEM (EDNET-OMS): A CASE STUDY OF BAN WANG TAKIAN SCHOOL IN KANCHANABURI PROVINCE
: Ban Wang Takian School is a small primary school under Kanchanaburi Primary Education Service Area Office 1 in Thailand. It has 93 students and 5 teachers. It is a school with the problem of having not enough teachers for its classrooms, since it has eight classrooms from Kindergarten II (second year kindergarten) to Prathom Suksa VI (Grade 6) levels. Learning achievement of Prathom Suksa VI students in the 2016 academic year, based on the Ordinary National Educational Test (O-NET) results, of five learning areas before implementing the Educational Network Operating Management System (EdNet-OMS) was at the 41.67 percent of the full score. Later on, the school director initiated the implementation of the Educational Network Operating Management System (EdNet-OMS) that was connected with the Distance Learning Television (DLTV) system of the Distance Education via Satellite Foundation under the Royal Patronage in order to utilize the benefits from DLTV up to its full potential. Then the initiation was complemented by the development of teachers to equip them with the ability and skills for learning management via the information technology system, and the creating of the cooperation network involving the parents and local community. As a result, the O-NET result of Prathom Suksa VI students in the 2017 academic year was increased to be at the 46.71 percent of the full score. The EdNet-OMS system was composed of the following five operational steps: (1) the creation of awareness step; (2) the development of the Educational Network Operating Management System (EdNet-OMS) step; (3) the empowerment step; (4) the monitoring and follow-up of the operation step; and (5) the evaluation step. The most important factor that enabled the operation to achieve success was the factor of the administrator with innovation leadership.