{"title":"考虑需求响应的安全评估与可靠性改进","authors":"Farhad Amin, Mohammad Mahdi Borhan Elmi","doi":"10.1109/EPDC53015.2021.9610824","DOIUrl":null,"url":null,"abstract":"With expanding of power system infrastructure, the possibility of consumer's participation in system security and reliability improvement programs has increased. To evaluate the effectiveness of demand response (DR), two indices have been studied. In the first stage, a performance index (PI) for security assessment was introduced and has been used to identify critical points of the transmission system in normal and emergency conditions. In the next stage, the Energy not supplied (ENS) index was calculated with different percentages of DR penetration. In this study, the information of the Khorasan 400 kV transmission system has been used. To investigate the sensitivity of PI and ENs due to customer's participation, such indices were calculated for 5% and 25% demand responsivity.","PeriodicalId":142680,"journal":{"name":"2021 25th Electrical Power Distribution Conference (EPDC)","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-08-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Security Assessment and Reliability Improvement with considering Demand Response\",\"authors\":\"Farhad Amin, Mohammad Mahdi Borhan Elmi\",\"doi\":\"10.1109/EPDC53015.2021.9610824\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"With expanding of power system infrastructure, the possibility of consumer's participation in system security and reliability improvement programs has increased. To evaluate the effectiveness of demand response (DR), two indices have been studied. In the first stage, a performance index (PI) for security assessment was introduced and has been used to identify critical points of the transmission system in normal and emergency conditions. In the next stage, the Energy not supplied (ENS) index was calculated with different percentages of DR penetration. In this study, the information of the Khorasan 400 kV transmission system has been used. To investigate the sensitivity of PI and ENs due to customer's participation, such indices were calculated for 5% and 25% demand responsivity.\",\"PeriodicalId\":142680,\"journal\":{\"name\":\"2021 25th Electrical Power Distribution Conference (EPDC)\",\"volume\":\"6 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-08-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 25th Electrical Power Distribution Conference (EPDC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EPDC53015.2021.9610824\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 25th Electrical Power Distribution Conference (EPDC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPDC53015.2021.9610824","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

随着电力系统基础设施的不断扩大,用户参与系统安全性和可靠性改进计划的可能性越来越大。为了评价需求响应(DR)的有效性,本文研究了两个指标。在第一阶段,引入了安全评估的性能指标(PI),并将其用于确定输电系统在正常和紧急情况下的临界点。在接下来的阶段中,计算了不同DR穿透百分比下的未供能(ENS)指数。本研究采用呼罗珊400千伏输电系统的信息。为了研究客户参与导致的PI和ENs的敏感性,对5%和25%的需求响应率进行了计算。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Security Assessment and Reliability Improvement with considering Demand Response
With expanding of power system infrastructure, the possibility of consumer's participation in system security and reliability improvement programs has increased. To evaluate the effectiveness of demand response (DR), two indices have been studied. In the first stage, a performance index (PI) for security assessment was introduced and has been used to identify critical points of the transmission system in normal and emergency conditions. In the next stage, the Energy not supplied (ENS) index was calculated with different percentages of DR penetration. In this study, the information of the Khorasan 400 kV transmission system has been used. To investigate the sensitivity of PI and ENs due to customer's participation, such indices were calculated for 5% and 25% demand responsivity.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信