带风力发电的配电微电网系统配电网脱扣减载方案设计

Chao-Shun Chen, C. Hsu, Y. Lin, H. Chuang, Y. Ju
{"title":"带风力发电的配电微电网系统配电网脱扣减载方案设计","authors":"Chao-Shun Chen, C. Hsu, Y. Lin, H. Chuang, Y. Ju","doi":"10.1109/IAS.2009.5324859","DOIUrl":null,"url":null,"abstract":"This paper is to study the enhancement of power system quality for distribution feeders with wind generator (WG) by applying the static synchronous compensator (STATCOM) to provide the voltage support during fault contingency. The critical clearing time for circuit breaker tripping to isolate the fault is derived by considering the low voltage ride through capability of WG and the reactive power compensation by STATCOM system. To restore the stable operation of the microgrid after the fault transient disturbance, an adaptive load shedding scheme is proposed to disconnect proper amount of nonessential loads according to the feeder loading and wind speed so that the tripping of WG due to under frequency constraint can be prevented. A Taipower distribution system has been selected for computer simulation to verify the effectiveness of the proposed strategy to determine the setting feeder CB tripping and load shedding to improve the power system stability of distribution feeder with wind generator.","PeriodicalId":178685,"journal":{"name":"2009 IEEE Industry Applications Society Annual Meeting","volume":"71 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-11-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Design of Tie Line Tripping and Load Shedding Scheme for Distribution Microgrid System with Wind Power Generation\",\"authors\":\"Chao-Shun Chen, C. Hsu, Y. Lin, H. Chuang, Y. Ju\",\"doi\":\"10.1109/IAS.2009.5324859\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper is to study the enhancement of power system quality for distribution feeders with wind generator (WG) by applying the static synchronous compensator (STATCOM) to provide the voltage support during fault contingency. The critical clearing time for circuit breaker tripping to isolate the fault is derived by considering the low voltage ride through capability of WG and the reactive power compensation by STATCOM system. To restore the stable operation of the microgrid after the fault transient disturbance, an adaptive load shedding scheme is proposed to disconnect proper amount of nonessential loads according to the feeder loading and wind speed so that the tripping of WG due to under frequency constraint can be prevented. A Taipower distribution system has been selected for computer simulation to verify the effectiveness of the proposed strategy to determine the setting feeder CB tripping and load shedding to improve the power system stability of distribution feeder with wind generator.\",\"PeriodicalId\":178685,\"journal\":{\"name\":\"2009 IEEE Industry Applications Society Annual Meeting\",\"volume\":\"71 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-11-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 IEEE Industry Applications Society Annual Meeting\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IAS.2009.5324859\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 IEEE Industry Applications Society Annual Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IAS.2009.5324859","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

本文研究了采用静态同步补偿器(STATCOM)在故障发生时提供电压支持,提高风力发电机配电网供电质量的方法。综合考虑WG的低压穿越能力和STATCOM系统的无功补偿,推导出断路器跳闸隔离故障的临界清除率。为恢复故障暂态扰动后微电网的稳定运行,提出了一种自适应减载方案,根据馈线负荷和风速,适当断开非必要负荷,防止电网因频率约束下跳闸。选取台湾某配电系统进行计算机仿真,验证了所提策略的有效性,以确定带风力发电机配电馈线的馈线CB脱扣和减载的设置策略,提高了系统的稳定性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Design of Tie Line Tripping and Load Shedding Scheme for Distribution Microgrid System with Wind Power Generation
This paper is to study the enhancement of power system quality for distribution feeders with wind generator (WG) by applying the static synchronous compensator (STATCOM) to provide the voltage support during fault contingency. The critical clearing time for circuit breaker tripping to isolate the fault is derived by considering the low voltage ride through capability of WG and the reactive power compensation by STATCOM system. To restore the stable operation of the microgrid after the fault transient disturbance, an adaptive load shedding scheme is proposed to disconnect proper amount of nonessential loads according to the feeder loading and wind speed so that the tripping of WG due to under frequency constraint can be prevented. A Taipower distribution system has been selected for computer simulation to verify the effectiveness of the proposed strategy to determine the setting feeder CB tripping and load shedding to improve the power system stability of distribution feeder with wind generator.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信