成功的数据仓库项目管理经验

Nayem Rahman
{"title":"成功的数据仓库项目管理经验","authors":"Nayem Rahman","doi":"10.4018/IJITPM.2017100103","DOIUrl":null,"url":null,"abstract":"This article provides an overview of project management aspects of a data warehouse application implementation. More specifically, the article discusses the project's implementation, challenges faced, and lessons learned. The project was initiated with an objective to redesign the procurement data pipeline of a data warehouse. The data flows from enterprise resource planning (ERP) system to enterprise data warehouse (EDW) to reporting environments. This project was challenged to deliver more quickly to the consumers with improved report performance, and reduced total cost of ownership (TCO) in EDW and data latency. Strategies of this project include providing continuous business value, and adopt new technologies in data extraction, transformation and loading. The project's strategy was also to implement it using some of the agile principles. The project team accomplished twice the scope of previous project in the same duration with a relatively smaller team. It also achieved improved quality of the products, and increased customer satisfaction by improving the reports' response time for management.","PeriodicalId":375999,"journal":{"name":"Int. J. Inf. Technol. Proj. Manag.","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2017-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Lessons from a Successful Data Warehousing Project Management\",\"authors\":\"Nayem Rahman\",\"doi\":\"10.4018/IJITPM.2017100103\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article provides an overview of project management aspects of a data warehouse application implementation. More specifically, the article discusses the project's implementation, challenges faced, and lessons learned. The project was initiated with an objective to redesign the procurement data pipeline of a data warehouse. The data flows from enterprise resource planning (ERP) system to enterprise data warehouse (EDW) to reporting environments. This project was challenged to deliver more quickly to the consumers with improved report performance, and reduced total cost of ownership (TCO) in EDW and data latency. Strategies of this project include providing continuous business value, and adopt new technologies in data extraction, transformation and loading. The project's strategy was also to implement it using some of the agile principles. The project team accomplished twice the scope of previous project in the same duration with a relatively smaller team. It also achieved improved quality of the products, and increased customer satisfaction by improving the reports' response time for management.\",\"PeriodicalId\":375999,\"journal\":{\"name\":\"Int. J. Inf. Technol. Proj. Manag.\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Int. J. Inf. Technol. Proj. Manag.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4018/IJITPM.2017100103\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Int. J. Inf. Technol. Proj. Manag.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4018/IJITPM.2017100103","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文概述了数据仓库应用程序实现的项目管理方面。更具体地说,本文讨论了项目的实现、面临的挑战和吸取的教训。该项目启动的目的是重新设计数据仓库的采购数据管道。数据从企业资源规划(ERP)系统流向企业数据仓库(EDW),再流向报表环境。该项目面临的挑战是,通过提高报告性能、降低EDW中的总拥有成本(TCO)和数据延迟,更快地向消费者交付报告。该项目的策略包括提供持续的业务价值,并在数据提取、转换和加载方面采用新技术。该项目的策略也是使用一些敏捷原则来实现它。项目团队在相同的时间内用一个相对较小的团队完成了之前项目范围的两倍。它还实现了产品质量的改进,并通过改进报告的管理响应时间提高了客户满意度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Lessons from a Successful Data Warehousing Project Management
This article provides an overview of project management aspects of a data warehouse application implementation. More specifically, the article discusses the project's implementation, challenges faced, and lessons learned. The project was initiated with an objective to redesign the procurement data pipeline of a data warehouse. The data flows from enterprise resource planning (ERP) system to enterprise data warehouse (EDW) to reporting environments. This project was challenged to deliver more quickly to the consumers with improved report performance, and reduced total cost of ownership (TCO) in EDW and data latency. Strategies of this project include providing continuous business value, and adopt new technologies in data extraction, transformation and loading. The project's strategy was also to implement it using some of the agile principles. The project team accomplished twice the scope of previous project in the same duration with a relatively smaller team. It also achieved improved quality of the products, and increased customer satisfaction by improving the reports' response time for management.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信