{"title":"充分利用智能电子设备能力,减少农村配电变电站布线","authors":"J. Vico, Terrence Smith, R. Hunt","doi":"10.1109/REPCON.2010.5476202","DOIUrl":null,"url":null,"abstract":"Each wired termination in a substation represents a cost associated with engineering, installing and testing that wired point. These costs include the obvious financial labor costs, but also include intangible costs such as installation and commissioning time, potential for human error, panel space, increased resistive burden in circuits, and larger raceways. Additionally, each wired termination represents stranded engineering time that is used design these terminations rather than allowing the engineering staff to solve problems.","PeriodicalId":303906,"journal":{"name":"2010 IEEE Rural Electric Power Conference (REPC)","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-05-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Fully utilizing the intelligent electronic device capability to reduce wiring in rural electric distribution substations\",\"authors\":\"J. Vico, Terrence Smith, R. Hunt\",\"doi\":\"10.1109/REPCON.2010.5476202\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Each wired termination in a substation represents a cost associated with engineering, installing and testing that wired point. These costs include the obvious financial labor costs, but also include intangible costs such as installation and commissioning time, potential for human error, panel space, increased resistive burden in circuits, and larger raceways. Additionally, each wired termination represents stranded engineering time that is used design these terminations rather than allowing the engineering staff to solve problems.\",\"PeriodicalId\":303906,\"journal\":{\"name\":\"2010 IEEE Rural Electric Power Conference (REPC)\",\"volume\":\"15 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-05-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 IEEE Rural Electric Power Conference (REPC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/REPCON.2010.5476202\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE Rural Electric Power Conference (REPC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/REPCON.2010.5476202","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Fully utilizing the intelligent electronic device capability to reduce wiring in rural electric distribution substations
Each wired termination in a substation represents a cost associated with engineering, installing and testing that wired point. These costs include the obvious financial labor costs, but also include intangible costs such as installation and commissioning time, potential for human error, panel space, increased resistive burden in circuits, and larger raceways. Additionally, each wired termination represents stranded engineering time that is used design these terminations rather than allowing the engineering staff to solve problems.