汽车制造公司注塑部物料搬运系统改进

Elbert Charistheo, T. D. Sofianti, A. Pratama
{"title":"汽车制造公司注塑部物料搬运系统改进","authors":"Elbert Charistheo, T. D. Sofianti, A. Pratama","doi":"10.1145/3429789.3429803","DOIUrl":null,"url":null,"abstract":"Material handling is an important aspect in the industry. Material handling supports all the supply for production which is why it plays a crucial role in the production line. Manual material handling uses workers to keep the supply of parts from storage to the assembly line. This is based on a Japanese automotive manufacturer company material handling problem. The material handling system is complex and not efficient. There are too many unnecessary movements for instance it took too many steps to supply the parts. This movement is seen as not efficient and categorized as waste in Lean Manufacturing. The data is gathered by observation the whole process in the injection section. DMAIC method is used as the main method to analyze the problem and to develop the solution. The Six Phases of The Generic Product Development Process is used to further develop the design of the supporting tool. The solution will reduce waste of movement in material handling and thus improve the productivity in the section by 19.6%.","PeriodicalId":416230,"journal":{"name":"Proceedings of the 2021 International Conference on Engineering and Information Technology for Sustainable Industry","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Material Handling System Improvement in Injection Section of Automotive Manufacturing Company\",\"authors\":\"Elbert Charistheo, T. D. Sofianti, A. Pratama\",\"doi\":\"10.1145/3429789.3429803\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Material handling is an important aspect in the industry. Material handling supports all the supply for production which is why it plays a crucial role in the production line. Manual material handling uses workers to keep the supply of parts from storage to the assembly line. This is based on a Japanese automotive manufacturer company material handling problem. The material handling system is complex and not efficient. There are too many unnecessary movements for instance it took too many steps to supply the parts. This movement is seen as not efficient and categorized as waste in Lean Manufacturing. The data is gathered by observation the whole process in the injection section. DMAIC method is used as the main method to analyze the problem and to develop the solution. The Six Phases of The Generic Product Development Process is used to further develop the design of the supporting tool. The solution will reduce waste of movement in material handling and thus improve the productivity in the section by 19.6%.\",\"PeriodicalId\":416230,\"journal\":{\"name\":\"Proceedings of the 2021 International Conference on Engineering and Information Technology for Sustainable Industry\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 2021 International Conference on Engineering and Information Technology for Sustainable Industry\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/3429789.3429803\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 2021 International Conference on Engineering and Information Technology for Sustainable Industry","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3429789.3429803","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

物料搬运是该行业的一个重要方面。物料搬运支持所有的生产供应,这就是为什么它在生产线上起着至关重要的作用。手工物料搬运使用工人来保持零件从仓库到装配线的供应。这是基于日本某汽车制造公司的物料搬运问题。物料搬运系统复杂,效率不高。有太多不必要的动作,例如,它需要太多的步骤来提供零件。在精益生产中,这种运动被认为是低效的,被归类为浪费。数据是通过在注射段观察整个过程来收集的。采用DMAIC方法作为分析问题和制定解决方案的主要方法。通用产品开发过程的六个阶段用于进一步开发配套工具的设计。该解决方案将减少物料搬运过程中的移动浪费,从而将该部分的生产率提高19.6%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Material Handling System Improvement in Injection Section of Automotive Manufacturing Company
Material handling is an important aspect in the industry. Material handling supports all the supply for production which is why it plays a crucial role in the production line. Manual material handling uses workers to keep the supply of parts from storage to the assembly line. This is based on a Japanese automotive manufacturer company material handling problem. The material handling system is complex and not efficient. There are too many unnecessary movements for instance it took too many steps to supply the parts. This movement is seen as not efficient and categorized as waste in Lean Manufacturing. The data is gathered by observation the whole process in the injection section. DMAIC method is used as the main method to analyze the problem and to develop the solution. The Six Phases of The Generic Product Development Process is used to further develop the design of the supporting tool. The solution will reduce waste of movement in material handling and thus improve the productivity in the section by 19.6%.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信