{"title":"基于精益施工的大型复杂建筑工程项目进度集成管理系统研究","authors":"Qin Shenjun, Ding Lieyun, Luo Han-bin","doi":"10.1109/IFITA.2010.113","DOIUrl":null,"url":null,"abstract":"There were many phases, hiberarchies, activities and partners in the schedule of construction engineering projects, especially the large-scale construction engineering projects, and the activities were complicated, the processes were very difficult, which has high impact on information communication between each partners, accordingly, the schedule would be out of controlling, the cost would be increased, and even the quality would be not satisfied with the owner. On the basical theory of Lean Construction and multistage plans of construction engineering project, Integration and Management System of Schedule in Large Complex Construction Engineering Projects (IMSSLCCEP) was proposed. It was studied from the data flow,hiberarchy and functional model. Finally,the cases of applying of IMSSLCCEP were studied, which educed that IMSSLCCEP was an effective way for large complex construction engineering schedule management from whole angle.","PeriodicalId":393802,"journal":{"name":"2010 International Forum on Information Technology and Applications","volume":"89 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-07-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Study on Integration and Management System of Schedule in Large Complex Construction Engineering Projects Based on Lean Construction\",\"authors\":\"Qin Shenjun, Ding Lieyun, Luo Han-bin\",\"doi\":\"10.1109/IFITA.2010.113\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"There were many phases, hiberarchies, activities and partners in the schedule of construction engineering projects, especially the large-scale construction engineering projects, and the activities were complicated, the processes were very difficult, which has high impact on information communication between each partners, accordingly, the schedule would be out of controlling, the cost would be increased, and even the quality would be not satisfied with the owner. On the basical theory of Lean Construction and multistage plans of construction engineering project, Integration and Management System of Schedule in Large Complex Construction Engineering Projects (IMSSLCCEP) was proposed. It was studied from the data flow,hiberarchy and functional model. Finally,the cases of applying of IMSSLCCEP were studied, which educed that IMSSLCCEP was an effective way for large complex construction engineering schedule management from whole angle.\",\"PeriodicalId\":393802,\"journal\":{\"name\":\"2010 International Forum on Information Technology and Applications\",\"volume\":\"89 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-07-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 International Forum on Information Technology and Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IFITA.2010.113\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Forum on Information Technology and Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IFITA.2010.113","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

建筑工程项目,特别是大型建筑工程项目,进度计划中存在多阶段、多层次、多活动、多合作伙伴,活动复杂,流程难度大,对各合作伙伴之间的信息沟通影响很大,导致进度失控,成本增加,甚至质量不满意。基于精益建设和建筑工程项目多阶段计划的基本理论,提出了大型复杂建筑工程项目进度集成管理系统(IMSSLCCEP)。从数据流、层次结构和功能模型三个方面对其进行了研究。最后,对IMSSLCCEP的应用实例进行了研究,从整体角度得出IMSSLCCEP是大型复杂建设工程进度管理的有效途径。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Study on Integration and Management System of Schedule in Large Complex Construction Engineering Projects Based on Lean Construction
There were many phases, hiberarchies, activities and partners in the schedule of construction engineering projects, especially the large-scale construction engineering projects, and the activities were complicated, the processes were very difficult, which has high impact on information communication between each partners, accordingly, the schedule would be out of controlling, the cost would be increased, and even the quality would be not satisfied with the owner. On the basical theory of Lean Construction and multistage plans of construction engineering project, Integration and Management System of Schedule in Large Complex Construction Engineering Projects (IMSSLCCEP) was proposed. It was studied from the data flow,hiberarchy and functional model. Finally,the cases of applying of IMSSLCCEP were studied, which educed that IMSSLCCEP was an effective way for large complex construction engineering schedule management from whole angle.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信