{"title":"北马其顿共和国皮西卡土坝破坏程度的地震勘探","authors":"Blagica Doneva, Marjan Delipetrev, G. Dimov","doi":"10.58903/a14161824","DOIUrl":null,"url":null,"abstract":"The reservoir was built in the middle of the 20th century with a total capacity of 750,000 m3. The height of the dam from the river terrace is 22 m, the length of the crown is 319 m, and the width of the crown is 6 m. Due to the low resistance of the earth dam and the increase of water level due to heavy rains, the lake has leaked on several occasions, causing floods and environmental disaster in the surrounding settlements. Due to heavy rains and overflow through the dam crown, damage to the downstream slope of the dam has occurred and the overall stability of the dam has been compromised. By controlled discharge of the reservoir it is brought to a stable state and the dam breakage is prevented. At the beginning of 2013, the outflow valves of the dam were opened as a result of heavy rains, with reservoir water flowing to more places and residents of the village and livestock evacuated. At the crown of the dam where there was the largest outflow of water, a gap of about 20 m wide and 3.5-4 m thick appeared. Geophysical - seismic surveys have been conducted to determine dam damage.","PeriodicalId":239226,"journal":{"name":"SUSTAINABLE EXTRACTION AND PROCESSING OF RAW MATERIALS JOURNAL","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-10-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"SEISMIC EXPLORATIONS FOR DEFINING THE DAMAGE TO THE EARTH DAM PISHICA IN THE REPUBLIC OF NORTH MACEDONIA\",\"authors\":\"Blagica Doneva, Marjan Delipetrev, G. Dimov\",\"doi\":\"10.58903/a14161824\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The reservoir was built in the middle of the 20th century with a total capacity of 750,000 m3. The height of the dam from the river terrace is 22 m, the length of the crown is 319 m, and the width of the crown is 6 m. Due to the low resistance of the earth dam and the increase of water level due to heavy rains, the lake has leaked on several occasions, causing floods and environmental disaster in the surrounding settlements. Due to heavy rains and overflow through the dam crown, damage to the downstream slope of the dam has occurred and the overall stability of the dam has been compromised. By controlled discharge of the reservoir it is brought to a stable state and the dam breakage is prevented. At the beginning of 2013, the outflow valves of the dam were opened as a result of heavy rains, with reservoir water flowing to more places and residents of the village and livestock evacuated. At the crown of the dam where there was the largest outflow of water, a gap of about 20 m wide and 3.5-4 m thick appeared. Geophysical - seismic surveys have been conducted to determine dam damage.\",\"PeriodicalId\":239226,\"journal\":{\"name\":\"SUSTAINABLE EXTRACTION AND PROCESSING OF RAW MATERIALS JOURNAL\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-10-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"SUSTAINABLE EXTRACTION AND PROCESSING OF RAW MATERIALS JOURNAL\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.58903/a14161824\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"SUSTAINABLE EXTRACTION AND PROCESSING OF RAW MATERIALS JOURNAL","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.58903/a14161824","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

水库建于20世纪中叶,总库容75万立方米。坝高距河阶地22米,坝长319米,坝宽6米。由于土坝阻力小,加上暴雨导致水位上升,堰塞湖多次发生渗漏,给周边居民点造成洪水和环境灾害。由于暴雨和坝顶溢流,大坝下游边坡遭到破坏,大坝的整体稳定性受到损害。通过对水库的控制泄流,使水库达到稳定状态,防止了大坝的溃坝。2013年初,由于暴雨,大坝的出水口打开,水库的水流向更多的地方,村里的居民和牲畜被疏散。在出水量最大的坝顶处,出现了约20米宽、3.5-4米厚的缺口。进行了地球物理-地震调查以确定大坝的损坏情况。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
SEISMIC EXPLORATIONS FOR DEFINING THE DAMAGE TO THE EARTH DAM PISHICA IN THE REPUBLIC OF NORTH MACEDONIA
The reservoir was built in the middle of the 20th century with a total capacity of 750,000 m3. The height of the dam from the river terrace is 22 m, the length of the crown is 319 m, and the width of the crown is 6 m. Due to the low resistance of the earth dam and the increase of water level due to heavy rains, the lake has leaked on several occasions, causing floods and environmental disaster in the surrounding settlements. Due to heavy rains and overflow through the dam crown, damage to the downstream slope of the dam has occurred and the overall stability of the dam has been compromised. By controlled discharge of the reservoir it is brought to a stable state and the dam breakage is prevented. At the beginning of 2013, the outflow valves of the dam were opened as a result of heavy rains, with reservoir water flowing to more places and residents of the village and livestock evacuated. At the crown of the dam where there was the largest outflow of water, a gap of about 20 m wide and 3.5-4 m thick appeared. Geophysical - seismic surveys have been conducted to determine dam damage.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信