自动驾驶汽车在不确定信息下的决策

J. Józefczyk, M. Hojda
{"title":"自动驾驶汽车在不确定信息下的决策","authors":"J. Józefczyk, M. Hojda","doi":"10.1109/SYSTOL.2010.5676032","DOIUrl":null,"url":null,"abstract":"A routing-scheduling problem in a class of manufacturing systems is considered for a group of autonomous vehicles moving in a common working space to perform a given set of tasks. The vehicles subject to unforeseen events, e.g. disruptions, failures, collisions which should be omitted, requiring the adaptation of originally developed schedules. Two approaches based on proactive and reactive scheduling are proposed. In the former, it is assumed that tasks' execution times are not known precisely, and the minimax absolute regret decision making problem is solved. The latter uses motion control decisions for the group of vehicles to current improvements of the schedules. Two versions are investigated referred to as open-loop and closed-loop decision making systems.","PeriodicalId":253370,"journal":{"name":"2010 Conference on Control and Fault-Tolerant Systems (SysTol)","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Decision making for autonomous vehicles in the presence of uncertain information\",\"authors\":\"J. Józefczyk, M. Hojda\",\"doi\":\"10.1109/SYSTOL.2010.5676032\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A routing-scheduling problem in a class of manufacturing systems is considered for a group of autonomous vehicles moving in a common working space to perform a given set of tasks. The vehicles subject to unforeseen events, e.g. disruptions, failures, collisions which should be omitted, requiring the adaptation of originally developed schedules. Two approaches based on proactive and reactive scheduling are proposed. In the former, it is assumed that tasks' execution times are not known precisely, and the minimax absolute regret decision making problem is solved. The latter uses motion control decisions for the group of vehicles to current improvements of the schedules. Two versions are investigated referred to as open-loop and closed-loop decision making systems.\",\"PeriodicalId\":253370,\"journal\":{\"name\":\"2010 Conference on Control and Fault-Tolerant Systems (SysTol)\",\"volume\":\"23 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-12-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 Conference on Control and Fault-Tolerant Systems (SysTol)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SYSTOL.2010.5676032\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 Conference on Control and Fault-Tolerant Systems (SysTol)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SYSTOL.2010.5676032","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

考虑一类制造系统中一组自动驾驶汽车在一个公共工作空间内执行一组给定任务的路由调度问题。受不可预见事件影响的车辆,如中断、故障、碰撞,这些应被忽略,需要调整最初制定的时间表。提出了两种基于主动调度和被动调度的方法。在前者中,假设任务的执行时间是不精确已知的,求解极小极大绝对后悔决策问题。后者使用车辆组的运动控制决策来改进当前的时间表。研究了开环和闭环决策系统两种版本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Decision making for autonomous vehicles in the presence of uncertain information
A routing-scheduling problem in a class of manufacturing systems is considered for a group of autonomous vehicles moving in a common working space to perform a given set of tasks. The vehicles subject to unforeseen events, e.g. disruptions, failures, collisions which should be omitted, requiring the adaptation of originally developed schedules. Two approaches based on proactive and reactive scheduling are proposed. In the former, it is assumed that tasks' execution times are not known precisely, and the minimax absolute regret decision making problem is solved. The latter uses motion control decisions for the group of vehicles to current improvements of the schedules. Two versions are investigated referred to as open-loop and closed-loop decision making systems.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信