考虑风电场运行中最优潮流问题

G. Contaxis, Andreas Vlachos
{"title":"考虑风电场运行中最优潮流问题","authors":"G. Contaxis, Andreas Vlachos","doi":"10.1109/PTC.1999.826494","DOIUrl":null,"url":null,"abstract":"In this paper, a modification to the optimal power flow problem, which accounts for the presence of wind parks and independent power producers (IPP) operation under large-scale integration of dispatchable wind energy resource in the power system, is described. A successive linear programming approach is utilized for the solution of the problem.","PeriodicalId":101688,"journal":{"name":"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1999-08-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Consideration of wind parks operation in the optimal power flow problem\",\"authors\":\"G. Contaxis, Andreas Vlachos\",\"doi\":\"10.1109/PTC.1999.826494\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, a modification to the optimal power flow problem, which accounts for the presence of wind parks and independent power producers (IPP) operation under large-scale integration of dispatchable wind energy resource in the power system, is described. A successive linear programming approach is utilized for the solution of the problem.\",\"PeriodicalId\":101688,\"journal\":{\"name\":\"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)\",\"volume\":\"23 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1999-08-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PTC.1999.826494\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PowerTech Budapest 99. Abstract Records. (Cat. No.99EX376)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PTC.1999.826494","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

在可调度风能资源大规模集成的情况下,对最优潮流问题进行了修正,考虑了风电场和独立发电机组的存在。采用逐次线性规划方法求解该问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Consideration of wind parks operation in the optimal power flow problem
In this paper, a modification to the optimal power flow problem, which accounts for the presence of wind parks and independent power producers (IPP) operation under large-scale integration of dispatchable wind energy resource in the power system, is described. A successive linear programming approach is utilized for the solution of the problem.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信