{"title":"利用鱼骨图法评价南苏门答腊省XYZ矿A坑B点覆岩生产目标实现情况","authors":"Aurah Masyitha Ayu Namira, A. V. Anas, Rizki Amalia, R. N. Tui","doi":"10.25042/10.25042/epi-ije.082021.08","DOIUrl":null,"url":null,"abstract":"PT XYZ is one of the companies engaged in the coal mining and energy in South Sumatra Province. Mining activities at the Pit A are still focused on stripping overburden using the Komatsu PC-3000E power shovel digging tool. The company has established a 513,333 BCM production target of overburden stripping in November 2020. While the total overburden production obtained is 488,162 BCM. The existence of factors that affect the productivity of the tool will determine the achievement of production targets, so it is necessary to evaluate production by identifying the factors causing the problem. One of method that can be used to determine the root cause of the problem is by using a fishbone diagram. A Fishbone diagram is a method used to identify the root cause of a quality problem. The purpose of this research is to calculate overburden production in November 2020, identify factors that influence the achievement of overburden production targets using a fishbone diagram, and make recommendations for improvement plans based on factors that affect the achievement of overburden production targets. Based on the results of the fishbone diagram analysis using the 4M pattern consisting recommendations for improvement plans can be designed for each factor causing the problem which is machine, methods, materials, and manpower.","PeriodicalId":387754,"journal":{"name":"EPI International Journal of Engineering","volume":"52 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-08-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Evaluation of Achievement of Overburden Production Target Using Fishbone Diagram Method at Pit A Site B PT XYZ, South Sumatera Province\",\"authors\":\"Aurah Masyitha Ayu Namira, A. V. Anas, Rizki Amalia, R. N. Tui\",\"doi\":\"10.25042/10.25042/epi-ije.082021.08\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PT XYZ is one of the companies engaged in the coal mining and energy in South Sumatra Province. Mining activities at the Pit A are still focused on stripping overburden using the Komatsu PC-3000E power shovel digging tool. The company has established a 513,333 BCM production target of overburden stripping in November 2020. While the total overburden production obtained is 488,162 BCM. The existence of factors that affect the productivity of the tool will determine the achievement of production targets, so it is necessary to evaluate production by identifying the factors causing the problem. One of method that can be used to determine the root cause of the problem is by using a fishbone diagram. A Fishbone diagram is a method used to identify the root cause of a quality problem. The purpose of this research is to calculate overburden production in November 2020, identify factors that influence the achievement of overburden production targets using a fishbone diagram, and make recommendations for improvement plans based on factors that affect the achievement of overburden production targets. Based on the results of the fishbone diagram analysis using the 4M pattern consisting recommendations for improvement plans can be designed for each factor causing the problem which is machine, methods, materials, and manpower.\",\"PeriodicalId\":387754,\"journal\":{\"name\":\"EPI International Journal of Engineering\",\"volume\":\"52 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-08-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"EPI International Journal of Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25042/10.25042/epi-ije.082021.08\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"EPI International Journal of Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25042/10.25042/epi-ije.082021.08","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

PT XYZ是在南苏门答腊省从事煤炭开采和能源的公司之一。A坑的采矿活动仍然集中在使用小松PC-3000E动力铲挖掘工具剥离覆盖层。该公司已确定2020年11月覆盖层剥离产量目标为513,333 BCM。而获得的上覆层总产量为488,162亿立方米。影响刀具生产率的因素的存在与否将决定生产目标的实现,因此有必要通过识别引起问题的因素来评价生产。可以用来确定问题根本原因的方法之一是使用鱼骨图。鱼骨图是一种用于确定质量问题根本原因的方法。本研究的目的是计算2020年11月覆岩产量,利用鱼骨图识别影响覆岩生产目标实现的因素,并根据影响覆岩生产目标实现的因素提出改进方案建议。基于使用4M模式的鱼骨图分析结果,可以针对导致问题的每个因素(机器、方法、材料和人力)设计改进计划建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Evaluation of Achievement of Overburden Production Target Using Fishbone Diagram Method at Pit A Site B PT XYZ, South Sumatera Province
PT XYZ is one of the companies engaged in the coal mining and energy in South Sumatra Province. Mining activities at the Pit A are still focused on stripping overburden using the Komatsu PC-3000E power shovel digging tool. The company has established a 513,333 BCM production target of overburden stripping in November 2020. While the total overburden production obtained is 488,162 BCM. The existence of factors that affect the productivity of the tool will determine the achievement of production targets, so it is necessary to evaluate production by identifying the factors causing the problem. One of method that can be used to determine the root cause of the problem is by using a fishbone diagram. A Fishbone diagram is a method used to identify the root cause of a quality problem. The purpose of this research is to calculate overburden production in November 2020, identify factors that influence the achievement of overburden production targets using a fishbone diagram, and make recommendations for improvement plans based on factors that affect the achievement of overburden production targets. Based on the results of the fishbone diagram analysis using the 4M pattern consisting recommendations for improvement plans can be designed for each factor causing the problem which is machine, methods, materials, and manpower.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信