风电场代表性年份风速校正的局限性

Shoufeng Wang, Zhenya Qi, Weidong Xu
{"title":"风电场代表性年份风速校正的局限性","authors":"Shoufeng Wang, Zhenya Qi, Weidong Xu","doi":"10.1117/12.2680421","DOIUrl":null,"url":null,"abstract":"In the wind resources assessment, it is very important to get the representative wind speed. The routine method used the liner relationship between weather station and wind farm to calculate it. The roughness and shape of the terrain sometimes takes into poor correlation. This text takes a wind farm in Shandong as example to show the limitation of this method.","PeriodicalId":201466,"journal":{"name":"Symposium on Advances in Electrical, Electronics and Computer Engineering","volume":"1225 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-05-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Limitations of wind speed correction in representative years of wind farms\",\"authors\":\"Shoufeng Wang, Zhenya Qi, Weidong Xu\",\"doi\":\"10.1117/12.2680421\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the wind resources assessment, it is very important to get the representative wind speed. The routine method used the liner relationship between weather station and wind farm to calculate it. The roughness and shape of the terrain sometimes takes into poor correlation. This text takes a wind farm in Shandong as example to show the limitation of this method.\",\"PeriodicalId\":201466,\"journal\":{\"name\":\"Symposium on Advances in Electrical, Electronics and Computer Engineering\",\"volume\":\"1225 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-05-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Symposium on Advances in Electrical, Electronics and Computer Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1117/12.2680421\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Symposium on Advances in Electrical, Electronics and Computer Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1117/12.2680421","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在风资源评价中,获得具有代表性的风速是非常重要的。常规方法采用气象站与风电场的线性关系进行计算。地形的粗糙度和形状有时相关性很差。本文以山东某风电场为例,说明了该方法的局限性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Limitations of wind speed correction in representative years of wind farms
In the wind resources assessment, it is very important to get the representative wind speed. The routine method used the liner relationship between weather station and wind farm to calculate it. The roughness and shape of the terrain sometimes takes into poor correlation. This text takes a wind farm in Shandong as example to show the limitation of this method.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信