{"title":"电网调峰调频下带自动发电系统的相变蓄热站控制策略研究","authors":"Qingqi Zhao, Yong-Xing Li, Hongyu Zhang, Tingxu Gao, Yi Yang, Wen Zheng","doi":"10.1109/CCDC.2018.8407875","DOIUrl":null,"url":null,"abstract":"In this paper, the operation strategy of thermal power units after the configuration of phase change heat storage station is put forward, and the mathematical model for calculating the peak-shaving capacity of thermal power units after the allocation of phase change heat storage stations is established. Based on the analysis of frequency requirements of electric power system, puts forward the analysis of high frequency and low frequency demand method by using the discrete Fourier transform, and the actual system all day long the proportion of high frequency components are quantitatively analyzed. Analyzes the effect of two typical 300MW and 200MW heating units in Northeast China on improving peak shaving capacity after installing heat storage stations. The results show that the peak shaving capacity of the two units can be increased by 21% and 14% at a given heat load level in the middle heating period. And based on the actual system data, the paper simulates and analyzes the FM strategy of energy storage participating in automatic generation control (AGC). The results show that the flexible allocation of energy storage resources based on area regulation requirement (ARR) has a better FM effect.","PeriodicalId":409960,"journal":{"name":"2018 Chinese Control And Decision Conference (CCDC)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Research on the control strategy of phase-change heat storage station with automatic generation system in power network peak regulation and frequency modulation\",\"authors\":\"Qingqi Zhao, Yong-Xing Li, Hongyu Zhang, Tingxu Gao, Yi Yang, Wen Zheng\",\"doi\":\"10.1109/CCDC.2018.8407875\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, the operation strategy of thermal power units after the configuration of phase change heat storage station is put forward, and the mathematical model for calculating the peak-shaving capacity of thermal power units after the allocation of phase change heat storage stations is established. Based on the analysis of frequency requirements of electric power system, puts forward the analysis of high frequency and low frequency demand method by using the discrete Fourier transform, and the actual system all day long the proportion of high frequency components are quantitatively analyzed. Analyzes the effect of two typical 300MW and 200MW heating units in Northeast China on improving peak shaving capacity after installing heat storage stations. The results show that the peak shaving capacity of the two units can be increased by 21% and 14% at a given heat load level in the middle heating period. And based on the actual system data, the paper simulates and analyzes the FM strategy of energy storage participating in automatic generation control (AGC). The results show that the flexible allocation of energy storage resources based on area regulation requirement (ARR) has a better FM effect.\",\"PeriodicalId\":409960,\"journal\":{\"name\":\"2018 Chinese Control And Decision Conference (CCDC)\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 Chinese Control And Decision Conference (CCDC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CCDC.2018.8407875\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 Chinese Control And Decision Conference (CCDC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CCDC.2018.8407875","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文提出了配置相变蓄热站后火电机组的运行策略,建立了配置相变蓄热站后火电机组调峰容量计算的数学模型。在分析电力系统频率需求的基础上,提出了利用离散傅立叶变换分析高频和低频需求的方法,并对实际系统全天高频分量的比例进行了定量分析。分析了东北地区两台典型300MW和200MW供热机组安装蓄热站后提高调峰能力的效果。结果表明,在供热中期一定热负荷水平下,两台机组的调峰能力可分别提高21%和14%。并以实际系统数据为基础,对储能参与自动发电控制(AGC)的调频策略进行了仿真分析。结果表明,基于面积调节需求(ARR)的储能资源柔性配置具有较好的调频效果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Research on the control strategy of phase-change heat storage station with automatic generation system in power network peak regulation and frequency modulation
In this paper, the operation strategy of thermal power units after the configuration of phase change heat storage station is put forward, and the mathematical model for calculating the peak-shaving capacity of thermal power units after the allocation of phase change heat storage stations is established. Based on the analysis of frequency requirements of electric power system, puts forward the analysis of high frequency and low frequency demand method by using the discrete Fourier transform, and the actual system all day long the proportion of high frequency components are quantitatively analyzed. Analyzes the effect of two typical 300MW and 200MW heating units in Northeast China on improving peak shaving capacity after installing heat storage stations. The results show that the peak shaving capacity of the two units can be increased by 21% and 14% at a given heat load level in the middle heating period. And based on the actual system data, the paper simulates and analyzes the FM strategy of energy storage participating in automatic generation control (AGC). The results show that the flexible allocation of energy storage resources based on area regulation requirement (ARR) has a better FM effect.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信