{"title":"分析材料控制和重型设备对建筑项目绩效的影响(收费公路建设项目案例研究——第一阶段)","authors":"Andi Maddeppungeng, Siti Asyiah, Muhamad Toha","doi":"10.36055/fondasi.v11i2.17100","DOIUrl":null,"url":null,"abstract":"pengumpulkan data.Analisa data menggunakan software regresi linear berganda. hasil penelitian, ABSTRACT A project is considered successful one of which is based on the point of view of the project being completed well or not. The current problem in construction projects in the Banten area is the difficulty of delivering materials and heavy equipment due to the Large-Scale Social Restriction (PSBB) policy being implemented in the Banten area. The purpose of this study was to determine the relationship between time performance of construction projects with material and heavy equipment control. The Serang-Panimbang Toll Road Construction Project Phase I became the subject of research. Project employees were asked to fill out a questionnaire as a data collection method. Data analysis using SPSS v.25 software for multiple linear regression analysis. Based on the study's findings, material control has an effect of 50.1% on project time performance, heavy equipment control has an effect of 84.7% Tirtayasa with the smallest influence on time performance is the availability of materials with a coefficient value of 0.193.","PeriodicalId":231649,"journal":{"name":"Fondasi : Jurnal Teknik Sipil","volume":"55 4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analisis Pengaruh Pengendalian Material dan Alat Berat Terhadap Kinerja Waktu Proyek Konstruksi (Studi Kasus Proyek Pembangunan Jalan Tol Serang – Panimbang Tahap 1)\",\"authors\":\"Andi Maddeppungeng, Siti Asyiah, Muhamad Toha\",\"doi\":\"10.36055/fondasi.v11i2.17100\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"pengumpulkan data.Analisa data menggunakan software regresi linear berganda. hasil penelitian, ABSTRACT A project is considered successful one of which is based on the point of view of the project being completed well or not. The current problem in construction projects in the Banten area is the difficulty of delivering materials and heavy equipment due to the Large-Scale Social Restriction (PSBB) policy being implemented in the Banten area. The purpose of this study was to determine the relationship between time performance of construction projects with material and heavy equipment control. The Serang-Panimbang Toll Road Construction Project Phase I became the subject of research. Project employees were asked to fill out a questionnaire as a data collection method. Data analysis using SPSS v.25 software for multiple linear regression analysis. Based on the study's findings, material control has an effect of 50.1% on project time performance, heavy equipment control has an effect of 84.7% Tirtayasa with the smallest influence on time performance is the availability of materials with a coefficient value of 0.193.\",\"PeriodicalId\":231649,\"journal\":{\"name\":\"Fondasi : Jurnal Teknik Sipil\",\"volume\":\"55 4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-11-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Fondasi : Jurnal Teknik Sipil\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36055/fondasi.v11i2.17100\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Fondasi : Jurnal Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36055/fondasi.v11i2.17100","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Analisis Pengaruh Pengendalian Material dan Alat Berat Terhadap Kinerja Waktu Proyek Konstruksi (Studi Kasus Proyek Pembangunan Jalan Tol Serang – Panimbang Tahap 1)
pengumpulkan data.Analisa data menggunakan software regresi linear berganda. hasil penelitian, ABSTRACT A project is considered successful one of which is based on the point of view of the project being completed well or not. The current problem in construction projects in the Banten area is the difficulty of delivering materials and heavy equipment due to the Large-Scale Social Restriction (PSBB) policy being implemented in the Banten area. The purpose of this study was to determine the relationship between time performance of construction projects with material and heavy equipment control. The Serang-Panimbang Toll Road Construction Project Phase I became the subject of research. Project employees were asked to fill out a questionnaire as a data collection method. Data analysis using SPSS v.25 software for multiple linear regression analysis. Based on the study's findings, material control has an effect of 50.1% on project time performance, heavy equipment control has an effect of 84.7% Tirtayasa with the smallest influence on time performance is the availability of materials with a coefficient value of 0.193.