{"title":"投资建设项目的实施风险,影响其成本","authors":"A. Pavlova","doi":"10.33920/str-01-2301-03","DOIUrl":null,"url":null,"abstract":"The author offers the expanded classification of risks by phases of the project lifecycle and subjects of investment activities, taking into account the development of project financing. High-quality preparation of the design estimates and construction contracts; application of guarantees; limitation; hedging; insurance; use of the special settlement accounts of the project company allowing to exercise strict control of target use of financial resources of the project (escrow account); other tools allowing to reduce the probability of negative consequences, are named as the most effective instruments of minimization and protection against risks.","PeriodicalId":339141,"journal":{"name":"Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)","volume":"140 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Risks of implementation of investment-and-construction projects, influencing their cost\",\"authors\":\"A. Pavlova\",\"doi\":\"10.33920/str-01-2301-03\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The author offers the expanded classification of risks by phases of the project lifecycle and subjects of investment activities, taking into account the development of project financing. High-quality preparation of the design estimates and construction contracts; application of guarantees; limitation; hedging; insurance; use of the special settlement accounts of the project company allowing to exercise strict control of target use of financial resources of the project (escrow account); other tools allowing to reduce the probability of negative consequences, are named as the most effective instruments of minimization and protection against risks.\",\"PeriodicalId\":339141,\"journal\":{\"name\":\"Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)\",\"volume\":\"140 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33920/str-01-2301-03\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Smetno-dogovornaya rabota v stroitel'stve (Estimated and contractual work in construction)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33920/str-01-2301-03","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Risks of implementation of investment-and-construction projects, influencing their cost
The author offers the expanded classification of risks by phases of the project lifecycle and subjects of investment activities, taking into account the development of project financing. High-quality preparation of the design estimates and construction contracts; application of guarantees; limitation; hedging; insurance; use of the special settlement accounts of the project company allowing to exercise strict control of target use of financial resources of the project (escrow account); other tools allowing to reduce the probability of negative consequences, are named as the most effective instruments of minimization and protection against risks.