{"title":"ERTMS/ETCS基线3及以后","authors":"P. Deutsch","doi":"10.1007/978-3-030-72003-2_3","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":178229,"journal":{"name":"Operating Rules and Interoperability in Trans-National High-Speed Rail","volume":"78 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Overview ERTMS/ETCS Baseline 3 and Beyond\",\"authors\":\"P. Deutsch\",\"doi\":\"10.1007/978-3-030-72003-2_3\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":178229,\"journal\":{\"name\":\"Operating Rules and Interoperability in Trans-National High-Speed Rail\",\"volume\":\"78 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Operating Rules and Interoperability in Trans-National High-Speed Rail\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1007/978-3-030-72003-2_3\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Operating Rules and Interoperability in Trans-National High-Speed Rail","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1007/978-3-030-72003-2_3","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}