{"title":"基于lfb的电力系统突发事件快速恢复算法","authors":"Y. Tohidi, A. Safdarian, M. Hesamzadeh","doi":"10.1109/PESGM.2014.6939788","DOIUrl":null,"url":null,"abstract":"Power systems are becoming older and more intense. Thus, disturbances are inevitable and it is important to develop a powerful methodology to lessen the damages afterward. This paper proposes a new linear formulation based on an approximated version of AC power flow model to compromise between speed and accuracy of decision making process. In the proposed method, voltage and reactive power violations as well as transmission system overloads are alleviated by either or both of generation rescheduling and load shedding. The developed method adopts the line flows and square of voltage magnitudes as the problem state variables. Simulation results on the IEEE-RTS96 system reveal that the proposed method outperforms both the conventional and heuristic approaches from the execution time and the computational effort viewpoints while keeping the accuracy of the results.","PeriodicalId":149134,"journal":{"name":"2014 IEEE PES General Meeting | Conference & Exposition","volume":"63 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An LFB-based algorithm for fast recovery of a power system from contingencies\",\"authors\":\"Y. Tohidi, A. Safdarian, M. Hesamzadeh\",\"doi\":\"10.1109/PESGM.2014.6939788\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Power systems are becoming older and more intense. Thus, disturbances are inevitable and it is important to develop a powerful methodology to lessen the damages afterward. This paper proposes a new linear formulation based on an approximated version of AC power flow model to compromise between speed and accuracy of decision making process. In the proposed method, voltage and reactive power violations as well as transmission system overloads are alleviated by either or both of generation rescheduling and load shedding. The developed method adopts the line flows and square of voltage magnitudes as the problem state variables. Simulation results on the IEEE-RTS96 system reveal that the proposed method outperforms both the conventional and heuristic approaches from the execution time and the computational effort viewpoints while keeping the accuracy of the results.\",\"PeriodicalId\":149134,\"journal\":{\"name\":\"2014 IEEE PES General Meeting | Conference & Exposition\",\"volume\":\"63 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-07-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 IEEE PES General Meeting | Conference & Exposition\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PESGM.2014.6939788\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE PES General Meeting | Conference & Exposition","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESGM.2014.6939788","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

电力系统正变得越来越老旧和紧张。因此,干扰是不可避免的,重要的是要发展一种强有力的方法来减少事后的损害。本文提出了一种新的基于近似交流潮流模型的线性公式,以折衷决策过程的速度和准确性。在该方法中,电压和无功违规以及输电系统过载可以通过发电重调度和减载任一或两者来缓解。该方法采用线流和电压幅值的平方作为问题状态变量。在IEEE-RTS96系统上的仿真结果表明,该方法在保持结果准确性的前提下,在执行时间和计算量方面都优于传统方法和启发式方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An LFB-based algorithm for fast recovery of a power system from contingencies
Power systems are becoming older and more intense. Thus, disturbances are inevitable and it is important to develop a powerful methodology to lessen the damages afterward. This paper proposes a new linear formulation based on an approximated version of AC power flow model to compromise between speed and accuracy of decision making process. In the proposed method, voltage and reactive power violations as well as transmission system overloads are alleviated by either or both of generation rescheduling and load shedding. The developed method adopts the line flows and square of voltage magnitudes as the problem state variables. Simulation results on the IEEE-RTS96 system reveal that the proposed method outperforms both the conventional and heuristic approaches from the execution time and the computational effort viewpoints while keeping the accuracy of the results.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信