{"title":"300mm工具自动化及其对fab设计和OEE的影响","authors":"M. Weiss","doi":"10.1109/ASMC.1996.557988","DOIUrl":null,"url":null,"abstract":"The challenge to building fabs in the 300 mm era will be to maximize the productivity of capital. One road in this direction is to increase Overall Equipment Effectiveness (OEE). At this time the approach being taken to increasing OEE involves the redesign of tools to improve reliability, increase throughput, reduce footprint, etc. The onset of 300 mm, however, presents an opportunity to take a more system wide approach at increasing OEE. In this paper we quantify the effects that material handling has on the cost of front end wafer fab by analyzing the effects that selection of batch size, carrier design, tool layout, wafer handling systems, etc. have on the Manufacturing Lead Time (MLT) of a chip. The paper then identifies design options for 300 mm handling components which increase the amount of time wafers spend getting value added in process tools, and decrease the overall non-value added handling times. This presents the basis for a description of a 300 mm fab tools and carriers which are designed as a total system to increase the OEE of the total fab, or the Overall Fab Effectiveness (OFE).","PeriodicalId":325204,"journal":{"name":"IEEE/SEMI 1996 Advanced Semiconductor Manufacturing Conference and Workshop. Theme-Innovative Approaches to Growth in the Semiconductor Industry. ASMC 96 Proceedings","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1996-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"300 mm tool automation and its impact on fab design and OEE\",\"authors\":\"M. Weiss\",\"doi\":\"10.1109/ASMC.1996.557988\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The challenge to building fabs in the 300 mm era will be to maximize the productivity of capital. One road in this direction is to increase Overall Equipment Effectiveness (OEE). At this time the approach being taken to increasing OEE involves the redesign of tools to improve reliability, increase throughput, reduce footprint, etc. The onset of 300 mm, however, presents an opportunity to take a more system wide approach at increasing OEE. In this paper we quantify the effects that material handling has on the cost of front end wafer fab by analyzing the effects that selection of batch size, carrier design, tool layout, wafer handling systems, etc. have on the Manufacturing Lead Time (MLT) of a chip. The paper then identifies design options for 300 mm handling components which increase the amount of time wafers spend getting value added in process tools, and decrease the overall non-value added handling times. This presents the basis for a description of a 300 mm fab tools and carriers which are designed as a total system to increase the OEE of the total fab, or the Overall Fab Effectiveness (OFE).\",\"PeriodicalId\":325204,\"journal\":{\"name\":\"IEEE/SEMI 1996 Advanced Semiconductor Manufacturing Conference and Workshop. Theme-Innovative Approaches to Growth in the Semiconductor Industry. ASMC 96 Proceedings\",\"volume\":\"18 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1996-11-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE/SEMI 1996 Advanced Semiconductor Manufacturing Conference and Workshop. Theme-Innovative Approaches to Growth in the Semiconductor Industry. ASMC 96 Proceedings\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ASMC.1996.557988\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE/SEMI 1996 Advanced Semiconductor Manufacturing Conference and Workshop. Theme-Innovative Approaches to Growth in the Semiconductor Industry. ASMC 96 Proceedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ASMC.1996.557988","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

在300毫米时代建造晶圆厂的挑战将是最大限度地提高资本生产率。这一方向的一条道路是提高整体设备效率(OEE)。目前,提高OEE的方法包括重新设计工具,以提高可靠性、增加吞吐量、减少占用空间等。然而,300mm的开始为采用更广泛的系统方法来增加OEE提供了机会。本文通过分析批量尺寸选择、载体设计、工具布局、晶圆处理系统等对芯片制造前置时间(MLT)的影响,量化了物料处理对前端晶圆厂成本的影响。然后,本文确定了300毫米处理组件的设计选项,这些组件增加了晶圆在工艺工具中获得增值的时间,并减少了总体非增值处理时间。这为描述300mm晶圆厂工具和载体提供了基础,这些工具和载体被设计为一个整体系统,以提高整个晶圆厂的OEE或整体晶圆厂效率(OFE)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
300 mm tool automation and its impact on fab design and OEE
The challenge to building fabs in the 300 mm era will be to maximize the productivity of capital. One road in this direction is to increase Overall Equipment Effectiveness (OEE). At this time the approach being taken to increasing OEE involves the redesign of tools to improve reliability, increase throughput, reduce footprint, etc. The onset of 300 mm, however, presents an opportunity to take a more system wide approach at increasing OEE. In this paper we quantify the effects that material handling has on the cost of front end wafer fab by analyzing the effects that selection of batch size, carrier design, tool layout, wafer handling systems, etc. have on the Manufacturing Lead Time (MLT) of a chip. The paper then identifies design options for 300 mm handling components which increase the amount of time wafers spend getting value added in process tools, and decrease the overall non-value added handling times. This presents the basis for a description of a 300 mm fab tools and carriers which are designed as a total system to increase the OEE of the total fab, or the Overall Fab Effectiveness (OFE).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信