{"title":"JT-60升级的初步结果","authors":"T. Kimura","doi":"10.1109/FUSION.1991.218711","DOIUrl":null,"url":null,"abstract":"The initial experimental results in the JT-60 (JAERI Tokamak-60) upgrade are reported along with an overview of reconstruction of JT-60 and future plans for the upgrade. Reconstruction of the JT-60 machine was successfully completed at the end of March 1991. 4-MA stable NB (neutral beam)-heated discharges with a discharge duration of 15 s and a flat-top duration of approximately 1 s have been achieved in a short operational period of 4 months. The stored energy has reached 5.1 MJ with I/sub P/=4 MA, B/sub t/=4 T, and NBI (neutral-beam injection) power of 20 MW. The global energy confinement time of 0.9 s has been achieved in deuterium OH discharges with I/sub P/=3 MA, B/sub t/=4 T, and n/sub e/=2*10/sup 19/ m/sup -3/. The energy confinement time of 0.25 s has been achieved in 15-20-MW NB-heated deuterium plasmas with I/sub p/=4 MA. The confinement time is in good agreement with that in the L-mode scaling of the ITER89 power law. The discharges of high ion temperature mode with T/sub i/(0) over 20 keV have been obtained by injecting deuterium NB with low target density of approximately 0.5*10/sup 19/ m/sup -3/, where the maximum neutron yield is 1.3*10/sup 16/ n/s and the energy confinement time is about 2.5 times as large as that of the International Thermonuclear Experimental Reactor power law scaling.<<ETX>>","PeriodicalId":318951,"journal":{"name":"[Proceedings] The 14th IEEE/NPSS Symposium Fusion Engineering","volume":"90 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1991-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Initial results from the JT-60 upgrade\",\"authors\":\"T. Kimura\",\"doi\":\"10.1109/FUSION.1991.218711\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The initial experimental results in the JT-60 (JAERI Tokamak-60) upgrade are reported along with an overview of reconstruction of JT-60 and future plans for the upgrade. Reconstruction of the JT-60 machine was successfully completed at the end of March 1991. 4-MA stable NB (neutral beam)-heated discharges with a discharge duration of 15 s and a flat-top duration of approximately 1 s have been achieved in a short operational period of 4 months. The stored energy has reached 5.1 MJ with I/sub P/=4 MA, B/sub t/=4 T, and NBI (neutral-beam injection) power of 20 MW. The global energy confinement time of 0.9 s has been achieved in deuterium OH discharges with I/sub P/=3 MA, B/sub t/=4 T, and n/sub e/=2*10/sup 19/ m/sup -3/. The energy confinement time of 0.25 s has been achieved in 15-20-MW NB-heated deuterium plasmas with I/sub p/=4 MA. The confinement time is in good agreement with that in the L-mode scaling of the ITER89 power law. The discharges of high ion temperature mode with T/sub i/(0) over 20 keV have been obtained by injecting deuterium NB with low target density of approximately 0.5*10/sup 19/ m/sup -3/, where the maximum neutron yield is 1.3*10/sup 16/ n/s and the energy confinement time is about 2.5 times as large as that of the International Thermonuclear Experimental Reactor power law scaling.<<ETX>>\",\"PeriodicalId\":318951,\"journal\":{\"name\":\"[Proceedings] The 14th IEEE/NPSS Symposium Fusion Engineering\",\"volume\":\"90 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-09-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"[Proceedings] The 14th IEEE/NPSS Symposium Fusion Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/FUSION.1991.218711\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"[Proceedings] The 14th IEEE/NPSS Symposium Fusion Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/FUSION.1991.218711","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

报告了JT-60 (JAERI托卡马克-60)升级的初步实验结果,以及JT-60的重建和未来升级计划的概述。JT-60机器的改造在1991年3月底成功完成。在4个月的短运行周期内,实现了4毫安稳定NB(中性束)加热放电,放电持续时间为15秒,平顶持续时间约为1秒。当I/sub P/=4 MA, B/sub t/=4 t, NBI(中性束注入)功率为20 MW时,储能达到5.1 MJ。在I/sub P/=3 MA, B/sub t/=4 t, n/sub e/=2*10/sup 19/ m/sup -3/条件下,氢氧氘放电的总能量约束时间为0.9 s。在I/sub /=4 MA的15-20 mw铌加热氘等离子体中实现了0.25 s的能量约束时间。约束时间与ITER89幂律的l模标度下的约束时间吻合较好。通过注入低靶密度约为0.5*10/sup 19/ m/sup -3/的NB氘,获得了T/sub i/(0) > 20 keV的高离子温度模式放电,其中最大中子产率为1.3*10/sup 16/ n/s,能量约束时间约为国际热核实验堆功率律标度的2.5倍。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Initial results from the JT-60 upgrade
The initial experimental results in the JT-60 (JAERI Tokamak-60) upgrade are reported along with an overview of reconstruction of JT-60 and future plans for the upgrade. Reconstruction of the JT-60 machine was successfully completed at the end of March 1991. 4-MA stable NB (neutral beam)-heated discharges with a discharge duration of 15 s and a flat-top duration of approximately 1 s have been achieved in a short operational period of 4 months. The stored energy has reached 5.1 MJ with I/sub P/=4 MA, B/sub t/=4 T, and NBI (neutral-beam injection) power of 20 MW. The global energy confinement time of 0.9 s has been achieved in deuterium OH discharges with I/sub P/=3 MA, B/sub t/=4 T, and n/sub e/=2*10/sup 19/ m/sup -3/. The energy confinement time of 0.25 s has been achieved in 15-20-MW NB-heated deuterium plasmas with I/sub p/=4 MA. The confinement time is in good agreement with that in the L-mode scaling of the ITER89 power law. The discharges of high ion temperature mode with T/sub i/(0) over 20 keV have been obtained by injecting deuterium NB with low target density of approximately 0.5*10/sup 19/ m/sup -3/, where the maximum neutron yield is 1.3*10/sup 16/ n/s and the energy confinement time is about 2.5 times as large as that of the International Thermonuclear Experimental Reactor power law scaling.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信