{"title":"影响国家IT项目成败的相关参数评估:以伊朗为例","authors":"S. Mohammadi, S. Zare-Hoseini, H. Jahanshahi","doi":"10.1109/ICMIT.2008.4654438","DOIUrl":null,"url":null,"abstract":"Emergence of Information technology and its rapid progress hugely influence every aspect of human life in the world; hence IT projects have a particular importance in different countries and organizations implementing IT projects have major role in the matter. Success or failure in an IT project depends on several internal or external factors. In this study, these factors and criteria are examined and determined for a nation-wide IT projects in Iran as a case study. A survey on the performed national IT projects in this case study enables us to analyze the drawbacks and advantages of the process and handling IT projects. Consequently it paves the way to reduce the failure rates of the IT projects in Iran.","PeriodicalId":332967,"journal":{"name":"2008 4th IEEE International Conference on Management of Innovation and Technology","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"An assessment of related parameters affecting on success and failures of national IT projects: Case study of Iran\",\"authors\":\"S. Mohammadi, S. Zare-Hoseini, H. Jahanshahi\",\"doi\":\"10.1109/ICMIT.2008.4654438\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Emergence of Information technology and its rapid progress hugely influence every aspect of human life in the world; hence IT projects have a particular importance in different countries and organizations implementing IT projects have major role in the matter. Success or failure in an IT project depends on several internal or external factors. In this study, these factors and criteria are examined and determined for a nation-wide IT projects in Iran as a case study. A survey on the performed national IT projects in this case study enables us to analyze the drawbacks and advantages of the process and handling IT projects. Consequently it paves the way to reduce the failure rates of the IT projects in Iran.\",\"PeriodicalId\":332967,\"journal\":{\"name\":\"2008 4th IEEE International Conference on Management of Innovation and Technology\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-10-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 4th IEEE International Conference on Management of Innovation and Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICMIT.2008.4654438\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 4th IEEE International Conference on Management of Innovation and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICMIT.2008.4654438","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
An assessment of related parameters affecting on success and failures of national IT projects: Case study of Iran
Emergence of Information technology and its rapid progress hugely influence every aspect of human life in the world; hence IT projects have a particular importance in different countries and organizations implementing IT projects have major role in the matter. Success or failure in an IT project depends on several internal or external factors. In this study, these factors and criteria are examined and determined for a nation-wide IT projects in Iran as a case study. A survey on the performed national IT projects in this case study enables us to analyze the drawbacks and advantages of the process and handling IT projects. Consequently it paves the way to reduce the failure rates of the IT projects in Iran.