{"title":"单位承诺","authors":"R. H. Kerr, J. Scheidt, A. J. Fontanna, J. Wiley","doi":"10.1201/b14906-4","DOIUrl":null,"url":null,"abstract":"The unit commitment program for the GE 412 digital process control computer optimizes the shutdown and startup of generating units so as to achieve minimum system fuel costs. Additional savings in the order of two to fifteen dollars per year per MW of installed capacity are estimated [1] over those gained from a feasible schedule. The program is flexible and considers numerous special operating restrictions. Several problems pertinent to Florida Power Corporation were solved within the program framework. Interrelation with other programs and various output options are discussed.","PeriodicalId":249437,"journal":{"name":"Mathematical Programming for Power Systems Operation with Applications in Python","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1966-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"73","resultStr":"{\"title\":\"Unit commitment\",\"authors\":\"R. H. Kerr, J. Scheidt, A. J. Fontanna, J. Wiley\",\"doi\":\"10.1201/b14906-4\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The unit commitment program for the GE 412 digital process control computer optimizes the shutdown and startup of generating units so as to achieve minimum system fuel costs. Additional savings in the order of two to fifteen dollars per year per MW of installed capacity are estimated [1] over those gained from a feasible schedule. The program is flexible and considers numerous special operating restrictions. Several problems pertinent to Florida Power Corporation were solved within the program framework. Interrelation with other programs and various output options are discussed.\",\"PeriodicalId\":249437,\"journal\":{\"name\":\"Mathematical Programming for Power Systems Operation with Applications in Python\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1966-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"73\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Mathematical Programming for Power Systems Operation with Applications in Python\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1201/b14906-4\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Mathematical Programming for Power Systems Operation with Applications in Python","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1201/b14906-4","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 73
摘要
GE 412数字过程控制计算机的机组承诺程序优化了发电机组的停机和启动,以实现最小的系统燃料成本。据估计,与可行的计划相比,每兆瓦装机容量每年可额外节省2至15美元[1]。该方案是灵活的,并考虑到许多特殊的操作限制。在方案框架内解决了与佛罗里达电力公司有关的几个问题。讨论了与其他程序的相互关系和各种输出选项。
The unit commitment program for the GE 412 digital process control computer optimizes the shutdown and startup of generating units so as to achieve minimum system fuel costs. Additional savings in the order of two to fifteen dollars per year per MW of installed capacity are estimated [1] over those gained from a feasible schedule. The program is flexible and considers numerous special operating restrictions. Several problems pertinent to Florida Power Corporation were solved within the program framework. Interrelation with other programs and various output options are discussed.