在高级设计课程中有更多的微软项目经验

T. W. Schultz
{"title":"在高级设计课程中有更多的微软项目经验","authors":"T. W. Schultz","doi":"10.1109/FIE.1995.483071","DOIUrl":null,"url":null,"abstract":"An update is given on experiences with the use of project scheduling software in a sequence of design classes. In addition to reviewing a previous approach (T.W. Schultz, 1994), it describes new steps taken to improve the student acceptance of the software. The initial learning process has been eased by \"Cue Cards\" included in the new version of PROJECT. Student acceptance has improved remarkably. The PERT chart has become unnecessary since task dependencies can now be shown directly on the Gantt chart. Homework to teach the concepts of tasks, dependencies, and scheduling now precedes the introduction of the software. This develops a clearer idea of task and scheduling concepts so the software becomes a simple tool rather than an inflexible master. Requiring weekly tracking Gantt charts increases the students' perception of the software's value. The paper concludes with fresh student comments and plans for future changes and improvements.","PeriodicalId":137465,"journal":{"name":"Proceedings Frontiers in Education 1995 25th Annual Conference. Engineering Education for the 21st Century","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"More experiences with Microsoft PROJECT in senior design classes\",\"authors\":\"T. W. Schultz\",\"doi\":\"10.1109/FIE.1995.483071\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"An update is given on experiences with the use of project scheduling software in a sequence of design classes. In addition to reviewing a previous approach (T.W. Schultz, 1994), it describes new steps taken to improve the student acceptance of the software. The initial learning process has been eased by \\\"Cue Cards\\\" included in the new version of PROJECT. Student acceptance has improved remarkably. The PERT chart has become unnecessary since task dependencies can now be shown directly on the Gantt chart. Homework to teach the concepts of tasks, dependencies, and scheduling now precedes the introduction of the software. This develops a clearer idea of task and scheduling concepts so the software becomes a simple tool rather than an inflexible master. Requiring weekly tracking Gantt charts increases the students' perception of the software's value. The paper concludes with fresh student comments and plans for future changes and improvements.\",\"PeriodicalId\":137465,\"journal\":{\"name\":\"Proceedings Frontiers in Education 1995 25th Annual Conference. Engineering Education for the 21st Century\",\"volume\":\"44 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1995-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings Frontiers in Education 1995 25th Annual Conference. Engineering Education for the 21st Century\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/FIE.1995.483071\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings Frontiers in Education 1995 25th Annual Conference. Engineering Education for the 21st Century","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/FIE.1995.483071","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

更新了在一系列设计课程中使用项目调度软件的经验。除了回顾以前的方法(T.W. Schultz, 1994)之外,它还描述了为提高学生对软件的接受程度而采取的新步骤。最初的学习过程已经被“提示卡”包括在新版本的项目。学生的接受度显著提高。PERT图已经变得没有必要了,因为任务依赖关系现在可以直接显示在甘特图上。现在,在引入软件之前,有家庭作业来教授任务、依赖关系和日程安排的概念。这样就形成了一个更清晰的任务和调度概念,这样软件就变成了一个简单的工具,而不是一个呆板的主人。要求每周跟踪甘特图增加了学生对软件价值的感知。论文最后提出了学生的新意见,并对未来的改变和改进提出了计划。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
More experiences with Microsoft PROJECT in senior design classes
An update is given on experiences with the use of project scheduling software in a sequence of design classes. In addition to reviewing a previous approach (T.W. Schultz, 1994), it describes new steps taken to improve the student acceptance of the software. The initial learning process has been eased by "Cue Cards" included in the new version of PROJECT. Student acceptance has improved remarkably. The PERT chart has become unnecessary since task dependencies can now be shown directly on the Gantt chart. Homework to teach the concepts of tasks, dependencies, and scheduling now precedes the introduction of the software. This develops a clearer idea of task and scheduling concepts so the software becomes a simple tool rather than an inflexible master. Requiring weekly tracking Gantt charts increases the students' perception of the software's value. The paper concludes with fresh student comments and plans for future changes and improvements.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信