{"title":"迈向欧洲内部电力市场:欧洲输电系统运营商之间有效的跨区域再调度成本分摊方法","authors":"M. Vukasovic, P. Schavemaker","doi":"10.1109/EEM.2014.6861241","DOIUrl":null,"url":null,"abstract":"In this paper, some possible causes for the activation of remedial actions are touched upon, seen within the light of the zonal-based market design in Europe. Supported by a small test case, an efficient and fair principle for cost-sharing of cross-zonal redispatch is proposed, that is in line with the European target model for capacity calculation and allocation. The developed cost sharing key for the cross-zonal redispatch interlinks both the commercial and the physical world by means of a common grid model, and facilitates a cost sharing for the different types of cross-zonal remedial actions which are “activated” either in the planning phase or deployed close to the real-time.","PeriodicalId":261127,"journal":{"name":"11th International Conference on the European Energy Market (EEM14)","volume":"76 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Towards the European internal electricity market: An efficient cross-zonal redispatch cost-sharing methodology among European transmission system operators\",\"authors\":\"M. Vukasovic, P. Schavemaker\",\"doi\":\"10.1109/EEM.2014.6861241\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, some possible causes for the activation of remedial actions are touched upon, seen within the light of the zonal-based market design in Europe. Supported by a small test case, an efficient and fair principle for cost-sharing of cross-zonal redispatch is proposed, that is in line with the European target model for capacity calculation and allocation. The developed cost sharing key for the cross-zonal redispatch interlinks both the commercial and the physical world by means of a common grid model, and facilitates a cost sharing for the different types of cross-zonal remedial actions which are “activated” either in the planning phase or deployed close to the real-time.\",\"PeriodicalId\":261127,\"journal\":{\"name\":\"11th International Conference on the European Energy Market (EEM14)\",\"volume\":\"76 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-05-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"11th International Conference on the European Energy Market (EEM14)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EEM.2014.6861241\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"11th International Conference on the European Energy Market (EEM14)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2014.6861241","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Towards the European internal electricity market: An efficient cross-zonal redispatch cost-sharing methodology among European transmission system operators
In this paper, some possible causes for the activation of remedial actions are touched upon, seen within the light of the zonal-based market design in Europe. Supported by a small test case, an efficient and fair principle for cost-sharing of cross-zonal redispatch is proposed, that is in line with the European target model for capacity calculation and allocation. The developed cost sharing key for the cross-zonal redispatch interlinks both the commercial and the physical world by means of a common grid model, and facilitates a cost sharing for the different types of cross-zonal remedial actions which are “activated” either in the planning phase or deployed close to the real-time.