{"title":"迈向欧洲内部电力市场:欧洲输电系统运营商之间有效的跨区域再调度成本分摊方法","authors":"M. Vukasovic, P. Schavemaker","doi":"10.1109/EEM.2014.6861241","DOIUrl":null,"url":null,"abstract":"In this paper, some possible causes for the activation of remedial actions are touched upon, seen within the light of the zonal-based market design in Europe. Supported by a small test case, an efficient and fair principle for cost-sharing of cross-zonal redispatch is proposed, that is in line with the European target model for capacity calculation and allocation. The developed cost sharing key for the cross-zonal redispatch interlinks both the commercial and the physical world by means of a common grid model, and facilitates a cost sharing for the different types of cross-zonal remedial actions which are “activated” either in the planning phase or deployed close to the real-time.","PeriodicalId":261127,"journal":{"name":"11th International Conference on the European Energy Market (EEM14)","volume":"76 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Towards the European internal electricity market: An efficient cross-zonal redispatch cost-sharing methodology among European transmission system operators\",\"authors\":\"M. Vukasovic, P. Schavemaker\",\"doi\":\"10.1109/EEM.2014.6861241\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, some possible causes for the activation of remedial actions are touched upon, seen within the light of the zonal-based market design in Europe. Supported by a small test case, an efficient and fair principle for cost-sharing of cross-zonal redispatch is proposed, that is in line with the European target model for capacity calculation and allocation. The developed cost sharing key for the cross-zonal redispatch interlinks both the commercial and the physical world by means of a common grid model, and facilitates a cost sharing for the different types of cross-zonal remedial actions which are “activated” either in the planning phase or deployed close to the real-time.\",\"PeriodicalId\":261127,\"journal\":{\"name\":\"11th International Conference on the European Energy Market (EEM14)\",\"volume\":\"76 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-05-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"11th International Conference on the European Energy Market (EEM14)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EEM.2014.6861241\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"11th International Conference on the European Energy Market (EEM14)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2014.6861241","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

在本文中,一些可能的原因,激活补救行动被触及,看到在欧洲的区域为基础的市场设计的光。通过一个小型测试案例,提出了一种高效、公平的跨区再调度费用分摊原则,该原则符合欧洲容量计算和分配的目标模型。开发的跨区域再调度的成本分摊关键是通过共同的网格模型将商业和物理世界联系起来,并促进在规划阶段“激活”或接近实时部署的不同类型的跨区域补救行动的成本分摊。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Towards the European internal electricity market: An efficient cross-zonal redispatch cost-sharing methodology among European transmission system operators
In this paper, some possible causes for the activation of remedial actions are touched upon, seen within the light of the zonal-based market design in Europe. Supported by a small test case, an efficient and fair principle for cost-sharing of cross-zonal redispatch is proposed, that is in line with the European target model for capacity calculation and allocation. The developed cost sharing key for the cross-zonal redispatch interlinks both the commercial and the physical world by means of a common grid model, and facilitates a cost sharing for the different types of cross-zonal remedial actions which are “activated” either in the planning phase or deployed close to the real-time.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信