分析在PAYAKUMBUH市建筑项目的恢复因素

Seprizal Seprizal, Dedi Kurniawan
{"title":"分析在PAYAKUMBUH市建筑项目的恢复因素","authors":"Seprizal Seprizal, Dedi Kurniawan","doi":"10.33559/err.v2i1.1351","DOIUrl":null,"url":null,"abstract":"The key to project success depends on four factors, including the project running according to the contract schedule, getting profits because expenses are as planned, problems that occur in the project are small, and there are no work accidents. If the technique used is not good, it will have a negative impact on project performance and can cause losses in terms of cost, quality, and time. The purpose of this study was to determine the factors that cause rework and what are the dominant factors that cause rework in the implementation of building construction projects in Payakumbuh City. The tests carried out include validity, reliability, and descriptive analysis based on mean values with the help of the Statistical Package for Social Science (SPSS) for Windows version 21.0 programme.This research identifies 10 factors that cause rework, the factor of lack of team work, the factor of wrong decision making, the factor of using tools that are not correct or not according to their function, the factor of the situation drawn with the field does not match. The factor of poor information flow from related parties, the factor of weak supervision of technical specs, the weather factor that causes delays in project implementation, the factor of incomplete contracts, the factor of acceleration due to owner requests, the factor of unexpected underground conditions. The results showed that the most dominant factor causing rework was the factor that the situation in the drawing did not match the field with a mean value of 3.90.","PeriodicalId":273539,"journal":{"name":"Ensiklopedia Research and Community Service Review","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ANALISIS FAKTOR-FAKTOR PENYEBAB REWORK PADA PROYEK KONSTRUKSI GEDUNG DI KOTA PAYAKUMBUH\",\"authors\":\"Seprizal Seprizal, Dedi Kurniawan\",\"doi\":\"10.33559/err.v2i1.1351\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The key to project success depends on four factors, including the project running according to the contract schedule, getting profits because expenses are as planned, problems that occur in the project are small, and there are no work accidents. If the technique used is not good, it will have a negative impact on project performance and can cause losses in terms of cost, quality, and time. The purpose of this study was to determine the factors that cause rework and what are the dominant factors that cause rework in the implementation of building construction projects in Payakumbuh City. The tests carried out include validity, reliability, and descriptive analysis based on mean values with the help of the Statistical Package for Social Science (SPSS) for Windows version 21.0 programme.This research identifies 10 factors that cause rework, the factor of lack of team work, the factor of wrong decision making, the factor of using tools that are not correct or not according to their function, the factor of the situation drawn with the field does not match. The factor of poor information flow from related parties, the factor of weak supervision of technical specs, the weather factor that causes delays in project implementation, the factor of incomplete contracts, the factor of acceleration due to owner requests, the factor of unexpected underground conditions. The results showed that the most dominant factor causing rework was the factor that the situation in the drawing did not match the field with a mean value of 3.90.\",\"PeriodicalId\":273539,\"journal\":{\"name\":\"Ensiklopedia Research and Community Service Review\",\"volume\":\"20 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-11-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Ensiklopedia Research and Community Service Review\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33559/err.v2i1.1351\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ensiklopedia Research and Community Service Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33559/err.v2i1.1351","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

项目成功的关键取决于四个因素,包括项目按照合同进度运行,因为费用按计划而获得利润,项目中发生的问题小,没有工作事故。如果使用的技术不好,它将对项目性能产生负面影响,并可能在成本、质量和时间方面造成损失。本研究的目的是确定造成返工的因素,以及在巴雅春布市建筑建设项目实施中导致返工的主导因素是什么。在Windows 21.0版社会科学统计软件包(SPSS)程序的帮助下,进行了效度、信度和基于平均值的描述性分析。本研究确定了导致返工的10个因素,缺乏团队合作的因素,错误决策的因素,使用工具不正确或不符合其功能的因素,与现场绘制的情况不匹配的因素。相关方信息流不畅的因素、技术规范监管不力的因素、导致项目实施延迟的天气因素、合同不完整的因素、因业主要求而加速的因素、意外的地下条件的因素。结果表明,导致返工的最主要因素是图纸情况与现场不匹配的因素,平均值为3.90。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ANALISIS FAKTOR-FAKTOR PENYEBAB REWORK PADA PROYEK KONSTRUKSI GEDUNG DI KOTA PAYAKUMBUH
The key to project success depends on four factors, including the project running according to the contract schedule, getting profits because expenses are as planned, problems that occur in the project are small, and there are no work accidents. If the technique used is not good, it will have a negative impact on project performance and can cause losses in terms of cost, quality, and time. The purpose of this study was to determine the factors that cause rework and what are the dominant factors that cause rework in the implementation of building construction projects in Payakumbuh City. The tests carried out include validity, reliability, and descriptive analysis based on mean values with the help of the Statistical Package for Social Science (SPSS) for Windows version 21.0 programme.This research identifies 10 factors that cause rework, the factor of lack of team work, the factor of wrong decision making, the factor of using tools that are not correct or not according to their function, the factor of the situation drawn with the field does not match. The factor of poor information flow from related parties, the factor of weak supervision of technical specs, the weather factor that causes delays in project implementation, the factor of incomplete contracts, the factor of acceleration due to owner requests, the factor of unexpected underground conditions. The results showed that the most dominant factor causing rework was the factor that the situation in the drawing did not match the field with a mean value of 3.90.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信