P2P网格的分散计算和通信密集型任务调度算法

P. Chauhan, Nitin
{"title":"P2P网格的分散计算和通信密集型任务调度算法","authors":"P. Chauhan, Nitin","doi":"10.1109/UKSim.2012.78","DOIUrl":null,"url":null,"abstract":"Most of earlier grid scheduling algorithms were based on centralized scheduler. Relying on central scheduler yields not only central point of failure, also, it is not possible because of scalability and political issues in present day gigantic grid systems. Hence, meta-schedulers came into limelight. However many authors recognizes limitations of hierarchical grid scheduling and proposed peer-to-peer (P2P) techniques, which have potential for grid scheduling. In this paper, new decentralized scheduling algorithm is proposed for P2P grid systems. In this method, an independent task sovereignly selects a most suitable grid node based on local information of immediate neighbors. A vital feature of this method is that it can schedule both computation intensive and communication intensive tasks to make grid system's workload balanced.","PeriodicalId":405479,"journal":{"name":"2012 UKSim 14th International Conference on Computer Modelling and Simulation","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-03-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":"{\"title\":\"Decentralized Computation and Communication Intensive Task Scheduling Algorithm for P2P Grid\",\"authors\":\"P. Chauhan, Nitin\",\"doi\":\"10.1109/UKSim.2012.78\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Most of earlier grid scheduling algorithms were based on centralized scheduler. Relying on central scheduler yields not only central point of failure, also, it is not possible because of scalability and political issues in present day gigantic grid systems. Hence, meta-schedulers came into limelight. However many authors recognizes limitations of hierarchical grid scheduling and proposed peer-to-peer (P2P) techniques, which have potential for grid scheduling. In this paper, new decentralized scheduling algorithm is proposed for P2P grid systems. In this method, an independent task sovereignly selects a most suitable grid node based on local information of immediate neighbors. A vital feature of this method is that it can schedule both computation intensive and communication intensive tasks to make grid system's workload balanced.\",\"PeriodicalId\":405479,\"journal\":{\"name\":\"2012 UKSim 14th International Conference on Computer Modelling and Simulation\",\"volume\":\"11 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-03-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"12\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 UKSim 14th International Conference on Computer Modelling and Simulation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/UKSim.2012.78\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 UKSim 14th International Conference on Computer Modelling and Simulation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UKSim.2012.78","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 12

摘要

早期的网格调度算法大多基于集中式调度程序。依赖中央调度器不仅会产生中心故障点,而且由于当今庞大的网格系统的可伸缩性和政治问题,这是不可能的。因此,元调度器开始受到关注。然而,许多作者认识到分层网格调度的局限性,并提出了具有网格调度潜力的点对点(P2P)技术。本文针对P2P网格系统提出了一种新的分散调度算法。在该方法中,独立任务根据最近邻的局部信息自主选择最合适的网格节点。该方法的一个重要特点是既可以调度计算密集型任务,又可以调度通信密集型任务,使网格系统的工作负载均衡。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Decentralized Computation and Communication Intensive Task Scheduling Algorithm for P2P Grid
Most of earlier grid scheduling algorithms were based on centralized scheduler. Relying on central scheduler yields not only central point of failure, also, it is not possible because of scalability and political issues in present day gigantic grid systems. Hence, meta-schedulers came into limelight. However many authors recognizes limitations of hierarchical grid scheduling and proposed peer-to-peer (P2P) techniques, which have potential for grid scheduling. In this paper, new decentralized scheduling algorithm is proposed for P2P grid systems. In this method, an independent task sovereignly selects a most suitable grid node based on local information of immediate neighbors. A vital feature of this method is that it can schedule both computation intensive and communication intensive tasks to make grid system's workload balanced.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信