{"title":"桑迪亚国家实验室Z翻新项目(ZR)的现状","authors":"E. Weinbrecht, D. Bloomquist, D. Mcdaniel, D. Tabor, J. W. Weed, T. Faturos, G. Mckee, P. J. Warner","doi":"10.1109/PPPS.2007.4345942","DOIUrl":null,"url":null,"abstract":"Sandia National Laboratories' Z Refurbishment (ZR) Project formally began in August 2002 to increase the Z Accelerator's utilization by providing the capability to perform more shots, improve precision and pulse shape variability, increase delivered current, and accomplish the improvements with minimal disruption to Z's ongoing programs. A project overview was provided at the 14th International Pulsed Power Conference in 2003 [1], This paper provides an update of the project including architectural changes over the past two years, timeframe for completion, and overall design and fabrication status.","PeriodicalId":200159,"journal":{"name":"2005 IEEE Pulsed Power Conference","volume":"52 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-06-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Status of the Z Refurbishment Project (ZR) at Sandia National Laboratories\",\"authors\":\"E. Weinbrecht, D. Bloomquist, D. Mcdaniel, D. Tabor, J. W. Weed, T. Faturos, G. Mckee, P. J. Warner\",\"doi\":\"10.1109/PPPS.2007.4345942\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Sandia National Laboratories' Z Refurbishment (ZR) Project formally began in August 2002 to increase the Z Accelerator's utilization by providing the capability to perform more shots, improve precision and pulse shape variability, increase delivered current, and accomplish the improvements with minimal disruption to Z's ongoing programs. A project overview was provided at the 14th International Pulsed Power Conference in 2003 [1], This paper provides an update of the project including architectural changes over the past two years, timeframe for completion, and overall design and fabrication status.\",\"PeriodicalId\":200159,\"journal\":{\"name\":\"2005 IEEE Pulsed Power Conference\",\"volume\":\"52 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-06-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2005 IEEE Pulsed Power Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PPPS.2007.4345942\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2005 IEEE Pulsed Power Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PPPS.2007.4345942","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Status of the Z Refurbishment Project (ZR) at Sandia National Laboratories
Sandia National Laboratories' Z Refurbishment (ZR) Project formally began in August 2002 to increase the Z Accelerator's utilization by providing the capability to perform more shots, improve precision and pulse shape variability, increase delivered current, and accomplish the improvements with minimal disruption to Z's ongoing programs. A project overview was provided at the 14th International Pulsed Power Conference in 2003 [1], This paper provides an update of the project including architectural changes over the past two years, timeframe for completion, and overall design and fabrication status.