{"title":"功能相似性对开发工作影响的评估","authors":"Özden Özcan Top, Seçkin Tunalilar, Onur Demirörs","doi":"10.1109/SEAA.2008.59","DOIUrl":null,"url":null,"abstract":"Although functional size is the primary input for effort and cost estimation formulas, the relation between functional size and development effort does not always hold in practice. Calculating the magnitude of functional similarity is perceived as a partial solution to overcome this problem. In this study we applied different approaches to identify the magnitude of functional similarity in five projects. The applicability of these approaches is evaluated by observing the impact of functional similarity on effort and code size of the projects. We also discuss the challenges, difficulties and opportunities faced during the case studies.","PeriodicalId":127633,"journal":{"name":"2008 34th Euromicro Conference Software Engineering and Advanced Applications","volume":"39 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-09-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Evaluation of the Effect of Functional Similarities on Development Effort\",\"authors\":\"Özden Özcan Top, Seçkin Tunalilar, Onur Demirörs\",\"doi\":\"10.1109/SEAA.2008.59\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Although functional size is the primary input for effort and cost estimation formulas, the relation between functional size and development effort does not always hold in practice. Calculating the magnitude of functional similarity is perceived as a partial solution to overcome this problem. In this study we applied different approaches to identify the magnitude of functional similarity in five projects. The applicability of these approaches is evaluated by observing the impact of functional similarity on effort and code size of the projects. We also discuss the challenges, difficulties and opportunities faced during the case studies.\",\"PeriodicalId\":127633,\"journal\":{\"name\":\"2008 34th Euromicro Conference Software Engineering and Advanced Applications\",\"volume\":\"39 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-09-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 34th Euromicro Conference Software Engineering and Advanced Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SEAA.2008.59\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 34th Euromicro Conference Software Engineering and Advanced Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SEAA.2008.59","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

虽然功能规模是工作量和成本估算公式的主要输入,但功能规模和开发工作量之间的关系在实践中并不总是成立。计算功能相似性的大小被认为是克服这个问题的部分解决方案。在这项研究中,我们应用不同的方法来确定五个项目的功能相似性的大小。这些方法的适用性是通过观察功能相似性对项目工作量和代码大小的影响来评估的。我们还讨论了案例研究过程中面临的挑战、困难和机遇。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Evaluation of the Effect of Functional Similarities on Development Effort
Although functional size is the primary input for effort and cost estimation formulas, the relation between functional size and development effort does not always hold in practice. Calculating the magnitude of functional similarity is perceived as a partial solution to overcome this problem. In this study we applied different approaches to identify the magnitude of functional similarity in five projects. The applicability of these approaches is evaluated by observing the impact of functional similarity on effort and code size of the projects. We also discuss the challenges, difficulties and opportunities faced during the case studies.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信