{"title":"铁路车站收发线确认综合自动控制系统的研究","authors":"Xiaoyan Yang","doi":"10.1145/3565387.3565436","DOIUrl":null,"url":null,"abstract":"To the misoperation of the electric locomotives being pulled into to no electricity unit (area), over-limited trains entering into non-specified track while the planned power failure of catenary contact electric lines of railway enterprise, this paper proposes a \"Three-elements and double confirmation\" processing and comparison method based on RF identification, screen mouse coordinates and high-definition imaging analysis of dynamic blackout operation area data comparison library, the entire data collection, it's analysis and logic judgment process does not interfere with the current running-related systems, also it avoids the complex procedures of obtaining existing system interface rights and it is an external independent early warning system . The use of the system effectively prevents the electric locomotive from entering the powerless area (network) and the accident of over-limited cargo loaded trains being discharged into the wrong track, hoping to provide some reference value to the railway field.","PeriodicalId":182491,"journal":{"name":"Proceedings of the 6th International Conference on Computer Science and Application Engineering","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on Integrated Automatic Control System for Railway Station Receiving and Dispatching Line Confirmation\",\"authors\":\"Xiaoyan Yang\",\"doi\":\"10.1145/3565387.3565436\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"To the misoperation of the electric locomotives being pulled into to no electricity unit (area), over-limited trains entering into non-specified track while the planned power failure of catenary contact electric lines of railway enterprise, this paper proposes a \\\"Three-elements and double confirmation\\\" processing and comparison method based on RF identification, screen mouse coordinates and high-definition imaging analysis of dynamic blackout operation area data comparison library, the entire data collection, it's analysis and logic judgment process does not interfere with the current running-related systems, also it avoids the complex procedures of obtaining existing system interface rights and it is an external independent early warning system . The use of the system effectively prevents the electric locomotive from entering the powerless area (network) and the accident of over-limited cargo loaded trains being discharged into the wrong track, hoping to provide some reference value to the railway field.\",\"PeriodicalId\":182491,\"journal\":{\"name\":\"Proceedings of the 6th International Conference on Computer Science and Application Engineering\",\"volume\":\"40 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 6th International Conference on Computer Science and Application Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/3565387.3565436\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 6th International Conference on Computer Science and Application Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3565387.3565436","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Research on Integrated Automatic Control System for Railway Station Receiving and Dispatching Line Confirmation
To the misoperation of the electric locomotives being pulled into to no electricity unit (area), over-limited trains entering into non-specified track while the planned power failure of catenary contact electric lines of railway enterprise, this paper proposes a "Three-elements and double confirmation" processing and comparison method based on RF identification, screen mouse coordinates and high-definition imaging analysis of dynamic blackout operation area data comparison library, the entire data collection, it's analysis and logic judgment process does not interfere with the current running-related systems, also it avoids the complex procedures of obtaining existing system interface rights and it is an external independent early warning system . The use of the system effectively prevents the electric locomotive from entering the powerless area (network) and the accident of over-limited cargo loaded trains being discharged into the wrong track, hoping to provide some reference value to the railway field.