Ardhan Rizakdy Fauzan, Harwidyo Eko Prasetyo, Andika Setiawan, Irnanda Satya Soeratmodjo
{"title":"THREE ARM UNSIGNALIZED INTERSECTION ON JALAN PERJUANGAN – JALAN KALIABANG BABELAN, NORTH BEKASI","authors":"Ardhan Rizakdy Fauzan, Harwidyo Eko Prasetyo, Andika Setiawan, Irnanda Satya Soeratmodjo","doi":"10.24853/ijcei.1.2.54-61","DOIUrl":null,"url":null,"abstract":"The intersection of Jalan Perjuangan - Jalan Kaliabang Babelan, North Bekasi is experiencing high traffic flow. It is because the intersection area is a shopping area and a residential area so that traffic jams often occur during busy traffic jams. This research aims to see the degree of saturation and delay at the research location. This research was conducted using a method based on MKJI 1997. The results of the analysis in the morning, the maximum flow that occurs on weekdays is 5533.7 pcu / hour, the minimum flow on holidays is 3982.2 pcu / hour with the degree of saturation on working day in the morning is equal to 1.18, and the degree of saturation in morning on holidays is 1.30 with a delay in morning in holidays is 36.1 sec / pcu, the delay in morning on working day is 5.7 sec / pcu. The results of the analysis during the day that the maximum flow occurs on holidays is 3905.6 pcu / hour, the minimum flow on working day is 3551.9 pcu / hour with the degree of saturation on holiday is 1.11, the degree of saturation on weekdays in the afternoon is 0.83 with a delay on holiday is 26.97 sec / pcu, a delay on working day is 13.48 sec / pcu. The results of the analysis in the afternoon the maximum flow occurs on weekdays of 6304.8 pcu / hour, the minimum flow on holidays is 5869.1 pcu / hour with the degree of saturation on working day is 1.84, the degree of saturation on holidays is 1.55 with a delay on working day is 0.74 sec / pcu, and delay on holidays is 1.08 sec / pcu","PeriodicalId":389729,"journal":{"name":"International Journal of Civil Engineering and Infrastructure","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-02-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Civil Engineering and Infrastructure","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24853/ijcei.1.2.54-61","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

北贝卡西的Jalan Perjuangan - Jalan Kaliabang Babelan十字路口交通流量很大。正是因为十字路口区域是购物区和住宅区,所以在交通繁忙的时候经常会发生交通堵塞。本研究旨在了解研究地点的饱和和延迟程度。本研究采用基于MKJI 1997的方法进行。上午分析结果显示,工作日上午最大流量为5533.7 pcu / h,节假日最小流量为3982.2 pcu / h,工作日上午饱和度为1.18,节假日上午饱和度为1.30,节假日上午延迟36.1秒/ pcu,工作日上午延迟5.7秒/ pcu。白天分析结果显示,节假日最大流量为3905.6 pcu / h,工作日最小流量为3551.9 pcu / h,节假日饱和度为1.11,工作日下午饱和度为0.83,节假日延误26.97秒/ pcu,工作日延误13.48秒/ pcu。分析结果显示,在下午,工作日流量最大,为6304.8 pcu / h,节假日流量最小,为5869.1 pcu / h,工作日饱和度为1.84,节假日饱和度为1.55,工作日延误0.74秒/ pcu,节假日延误1.08秒/ pcu
本文章由计算机程序翻译,如有差异,请以英文原文为准。
THREE ARM UNSIGNALIZED INTERSECTION ON JALAN PERJUANGAN – JALAN KALIABANG BABELAN, NORTH BEKASI
The intersection of Jalan Perjuangan - Jalan Kaliabang Babelan, North Bekasi is experiencing high traffic flow. It is because the intersection area is a shopping area and a residential area so that traffic jams often occur during busy traffic jams. This research aims to see the degree of saturation and delay at the research location. This research was conducted using a method based on MKJI 1997. The results of the analysis in the morning, the maximum flow that occurs on weekdays is 5533.7 pcu / hour, the minimum flow on holidays is 3982.2 pcu / hour with the degree of saturation on working day in the morning is equal to 1.18, and the degree of saturation in morning on holidays is 1.30 with a delay in morning in holidays is 36.1 sec / pcu, the delay in morning on working day is 5.7 sec / pcu. The results of the analysis during the day that the maximum flow occurs on holidays is 3905.6 pcu / hour, the minimum flow on working day is 3551.9 pcu / hour with the degree of saturation on holiday is 1.11, the degree of saturation on weekdays in the afternoon is 0.83 with a delay on holiday is 26.97 sec / pcu, a delay on working day is 13.48 sec / pcu. The results of the analysis in the afternoon the maximum flow occurs on weekdays of 6304.8 pcu / hour, the minimum flow on holidays is 5869.1 pcu / hour with the degree of saturation on working day is 1.84, the degree of saturation on holidays is 1.55 with a delay on working day is 0.74 sec / pcu, and delay on holidays is 1.08 sec / pcu
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信