基于变压器的电力时间序列预测——以雅加达万丹为例

Indira Alima Fasvazahra, D. Adytia, A. Simaremare
{"title":"基于变压器的电力时间序列预测——以雅加达万丹为例","authors":"Indira Alima Fasvazahra, D. Adytia, A. Simaremare","doi":"10.1109/IC2IE56416.2022.9970104","DOIUrl":null,"url":null,"abstract":"As the number of people in Indonesia grows, the need for various basic things, such as food, house, and even electricity demand also increases. Emerging technologies and increased use of electronic devices increase electrical demands. In metropolitan cities such as Jakarta and Banten, the need for electrical energy is higher due to reasonably rapid development. An accurate electricity forecasting is needed to increase the efficiency of electricity generators. This research aims to forecast the electricity load in Jakarta and Banten using the Transformer method to perform time series forecasting. We use four years electricity load dataset, ranging from January 2018 to October 2021 in Jakarta and Banten areas. We investigate the sensitivity of the method in terms of length of lookback to forecast electricity load for seven days ahead. By using the best lookback setting, we obtain the best accuracy value for prediction is with MSE of 78.35, RMSE of 8.85, and R2 of 0.994.","PeriodicalId":151165,"journal":{"name":"2022 5th International Conference of Computer and Informatics Engineering (IC2IE)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Electricity Time Series Forecasting by using Transformer with Case Study in Jakarta Banten\",\"authors\":\"Indira Alima Fasvazahra, D. Adytia, A. Simaremare\",\"doi\":\"10.1109/IC2IE56416.2022.9970104\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As the number of people in Indonesia grows, the need for various basic things, such as food, house, and even electricity demand also increases. Emerging technologies and increased use of electronic devices increase electrical demands. In metropolitan cities such as Jakarta and Banten, the need for electrical energy is higher due to reasonably rapid development. An accurate electricity forecasting is needed to increase the efficiency of electricity generators. This research aims to forecast the electricity load in Jakarta and Banten using the Transformer method to perform time series forecasting. We use four years electricity load dataset, ranging from January 2018 to October 2021 in Jakarta and Banten areas. We investigate the sensitivity of the method in terms of length of lookback to forecast electricity load for seven days ahead. By using the best lookback setting, we obtain the best accuracy value for prediction is with MSE of 78.35, RMSE of 8.85, and R2 of 0.994.\",\"PeriodicalId\":151165,\"journal\":{\"name\":\"2022 5th International Conference of Computer and Informatics Engineering (IC2IE)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-09-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 5th International Conference of Computer and Informatics Engineering (IC2IE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IC2IE56416.2022.9970104\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 5th International Conference of Computer and Informatics Engineering (IC2IE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IC2IE56416.2022.9970104","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

随着印尼人口的增长,对食物、住房、甚至电力等各种基本物品的需求也在增加。新兴技术和电子设备使用的增加增加了电力需求。在雅加达和万丹等大都市,由于发展相当迅速,对电能的需求更高。为了提高发电机组的发电效率,需要进行准确的电力预测。本研究旨在利用Transformer方法进行时间序列预测雅加达和万丹的电力负荷。我们使用了雅加达和万丹地区从2018年1月到2021年10月的四年电力负荷数据集。我们研究了该方法在回顾长度方面的敏感性,以预测未来7天的电力负荷。采用最佳回溯设置,得到最佳预测精度值为MSE为78.35,RMSE为8.85,R2为0.994。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Electricity Time Series Forecasting by using Transformer with Case Study in Jakarta Banten
As the number of people in Indonesia grows, the need for various basic things, such as food, house, and even electricity demand also increases. Emerging technologies and increased use of electronic devices increase electrical demands. In metropolitan cities such as Jakarta and Banten, the need for electrical energy is higher due to reasonably rapid development. An accurate electricity forecasting is needed to increase the efficiency of electricity generators. This research aims to forecast the electricity load in Jakarta and Banten using the Transformer method to perform time series forecasting. We use four years electricity load dataset, ranging from January 2018 to October 2021 in Jakarta and Banten areas. We investigate the sensitivity of the method in terms of length of lookback to forecast electricity load for seven days ahead. By using the best lookback setting, we obtain the best accuracy value for prediction is with MSE of 78.35, RMSE of 8.85, and R2 of 0.994.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信