{"title":"某造纸厂配电系统改造","authors":"L.S. Kirek, M. Woodman","doi":"10.1109/PAPCON.1994.324494","DOIUrl":null,"url":null,"abstract":"A utility capacity increase from 50 to 100 MVA was implemented in a large Kraft paper mill. All existing plant 15 kV switchgear and controls were replaced and a new tie line constructed during a nine month period prior to the utility increase. Electrical and process control rooms were built to house new switchgear and computer control equipment. All installation work was done during outages scheduled for other plant objectives. New switchgear installed consists of 42 cells of 1000 MVA class equipment. The control system includes operator workstations, supervisory PLC, and remote I/O racks. Breaker control, metering, and load shedding functions are performed by the control system.<<ETX>>","PeriodicalId":269467,"journal":{"name":"Proceedings of IEEE Pulp and Paper Industry Conference","volume":"52 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1994-06-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Upgrade of a paper mill power distribution system\",\"authors\":\"L.S. Kirek, M. Woodman\",\"doi\":\"10.1109/PAPCON.1994.324494\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A utility capacity increase from 50 to 100 MVA was implemented in a large Kraft paper mill. All existing plant 15 kV switchgear and controls were replaced and a new tie line constructed during a nine month period prior to the utility increase. Electrical and process control rooms were built to house new switchgear and computer control equipment. All installation work was done during outages scheduled for other plant objectives. New switchgear installed consists of 42 cells of 1000 MVA class equipment. The control system includes operator workstations, supervisory PLC, and remote I/O racks. Breaker control, metering, and load shedding functions are performed by the control system.<<ETX>>\",\"PeriodicalId\":269467,\"journal\":{\"name\":\"Proceedings of IEEE Pulp and Paper Industry Conference\",\"volume\":\"52 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1994-06-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of IEEE Pulp and Paper Industry Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PAPCON.1994.324494\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of IEEE Pulp and Paper Industry Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PAPCON.1994.324494","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在一家大型牛皮纸造纸厂实施了公用事业容量从50到100 MVA的增加。在公用事业增加之前的9个月期间,所有现有的15千伏开关设备和控制设备都被更换,并建造了一条新的联络线。电气和过程控制室被用来容纳新的开关设备和计算机控制设备。所有的安装工作都是在工厂其他目标计划的停机期间完成的。新安装的开关柜由42个1000 MVA级设备组成。控制系统包括操作员工作站、监控PLC和远程I/O机架。断路器控制、计量和减载功能由控制系统执行。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Upgrade of a paper mill power distribution system
A utility capacity increase from 50 to 100 MVA was implemented in a large Kraft paper mill. All existing plant 15 kV switchgear and controls were replaced and a new tie line constructed during a nine month period prior to the utility increase. Electrical and process control rooms were built to house new switchgear and computer control equipment. All installation work was done during outages scheduled for other plant objectives. New switchgear installed consists of 42 cells of 1000 MVA class equipment. The control system includes operator workstations, supervisory PLC, and remote I/O racks. Breaker control, metering, and load shedding functions are performed by the control system.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信