呆伯特时刻:探索影响项目经理基线时间表准确性的因素

James Prater, K. Kirytopoulos, T. Ma
{"title":"呆伯特时刻:探索影响项目经理基线时间表准确性的因素","authors":"James Prater, K. Kirytopoulos, T. Ma","doi":"10.4018/IJITPM.2019040104","DOIUrl":null,"url":null,"abstract":"Developing and delivering a project to an agreed schedule is fundamentally what project managers do. There is still an ongoing debate about schedule delays. This research investigates the development of schedules through semi-structured in-depth interviews. The findings reveal that half of the respondents believe that delays reported in the media are not real and should be attributed to scope changes. IT project managers estimating techniques include bottom-up estimates, analogy, and expert judgement. Impeding factors reported for the development of realistic schedules were technical (e.g. honest mistakes) and political (e.g. completion dates imposed by the sponsor). Respondents did not mention any psychological factors, although most were aware of optimism bias. However, they were not familiar with approaches to mitigate its impacts. Yet, when these techniques were mentioned, the overwhelming majority agreed that these mitigation approaches would change their schedule estimate.","PeriodicalId":375999,"journal":{"name":"Int. J. Inf. Technol. Proj. Manag.","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Dilbert Moments: Exploring the Factors Impacting Upon the Accuracy of Project Managers' Baseline Schedules\",\"authors\":\"James Prater, K. Kirytopoulos, T. Ma\",\"doi\":\"10.4018/IJITPM.2019040104\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Developing and delivering a project to an agreed schedule is fundamentally what project managers do. There is still an ongoing debate about schedule delays. This research investigates the development of schedules through semi-structured in-depth interviews. The findings reveal that half of the respondents believe that delays reported in the media are not real and should be attributed to scope changes. IT project managers estimating techniques include bottom-up estimates, analogy, and expert judgement. Impeding factors reported for the development of realistic schedules were technical (e.g. honest mistakes) and political (e.g. completion dates imposed by the sponsor). Respondents did not mention any psychological factors, although most were aware of optimism bias. However, they were not familiar with approaches to mitigate its impacts. Yet, when these techniques were mentioned, the overwhelming majority agreed that these mitigation approaches would change their schedule estimate.\",\"PeriodicalId\":375999,\"journal\":{\"name\":\"Int. J. Inf. Technol. Proj. Manag.\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Int. J. Inf. Technol. Proj. Manag.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.4018/IJITPM.2019040104\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Int. J. Inf. Technol. Proj. Manag.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4018/IJITPM.2019040104","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

按照商定的时间表开发和交付项目是项目经理的基本工作。关于计划延误的争论仍在继续。本研究通过半结构化的深度访谈来调查时间表的发展。调查结果显示,一半的答复者认为媒体报道的延误是不真实的,应归因于范围变化。IT项目经理的评估技术包括自下而上的评估、类比和专家判断。据报告,阻碍制定现实时间表的因素有技术上的(如无心之过)和政治上的(如发起人规定的完成日期)。受访者没有提到任何心理因素,尽管大多数人都意识到乐观主义偏见。然而,他们并不熟悉减轻其影响的方法。然而,当提到这些技术时,绝大多数人同意这些缓解方法将改变他们的进度估计。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Dilbert Moments: Exploring the Factors Impacting Upon the Accuracy of Project Managers' Baseline Schedules
Developing and delivering a project to an agreed schedule is fundamentally what project managers do. There is still an ongoing debate about schedule delays. This research investigates the development of schedules through semi-structured in-depth interviews. The findings reveal that half of the respondents believe that delays reported in the media are not real and should be attributed to scope changes. IT project managers estimating techniques include bottom-up estimates, analogy, and expert judgement. Impeding factors reported for the development of realistic schedules were technical (e.g. honest mistakes) and political (e.g. completion dates imposed by the sponsor). Respondents did not mention any psychological factors, although most were aware of optimism bias. However, they were not familiar with approaches to mitigate its impacts. Yet, when these techniques were mentioned, the overwhelming majority agreed that these mitigation approaches would change their schedule estimate.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信