{"title":"考虑到未使用的可能性的风险,在乌克兰建造新的水力发电厂的可行性分析","authors":"D. Stefanyshyn","doi":"10.32347/2411-4049.2019.3.33-45","DOIUrl":null,"url":null,"abstract":"The article presents results of feasibility analysis of construction of new hydropower plants in Ukraine according to the Hydropower development program for the period till 2026, which was approved by our Government in 2016. In particular, there are analyzed perspective plans for building the Kakhovka hydropower plant #2 and six new hydropower plants on the river Dniester, as well as developing small hydropower in the country. The feasibility analysis is based on pairwise comparison of alternatives by the criterion of minimum aggregate risk taking into account the risk of unused opportunities. Components of aggregate risks of alternatives are estimated in dimensionless units for water-energy and operability characteristics and costs of commissioning of new hydro aggregates.","PeriodicalId":313972,"journal":{"name":"Environmental safety and natural resources","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Feasibility analysis of construction of new hydropower plants in Ukraine taking into account the risk of unused possibilities\",\"authors\":\"D. Stefanyshyn\",\"doi\":\"10.32347/2411-4049.2019.3.33-45\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The article presents results of feasibility analysis of construction of new hydropower plants in Ukraine according to the Hydropower development program for the period till 2026, which was approved by our Government in 2016. In particular, there are analyzed perspective plans for building the Kakhovka hydropower plant #2 and six new hydropower plants on the river Dniester, as well as developing small hydropower in the country. The feasibility analysis is based on pairwise comparison of alternatives by the criterion of minimum aggregate risk taking into account the risk of unused opportunities. Components of aggregate risks of alternatives are estimated in dimensionless units for water-energy and operability characteristics and costs of commissioning of new hydro aggregates.\",\"PeriodicalId\":313972,\"journal\":{\"name\":\"Environmental safety and natural resources\",\"volume\":\"29 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-09-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Environmental safety and natural resources\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.32347/2411-4049.2019.3.33-45\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Environmental safety and natural resources","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32347/2411-4049.2019.3.33-45","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Feasibility analysis of construction of new hydropower plants in Ukraine taking into account the risk of unused possibilities
The article presents results of feasibility analysis of construction of new hydropower plants in Ukraine according to the Hydropower development program for the period till 2026, which was approved by our Government in 2016. In particular, there are analyzed perspective plans for building the Kakhovka hydropower plant #2 and six new hydropower plants on the river Dniester, as well as developing small hydropower in the country. The feasibility analysis is based on pairwise comparison of alternatives by the criterion of minimum aggregate risk taking into account the risk of unused opportunities. Components of aggregate risks of alternatives are estimated in dimensionless units for water-energy and operability characteristics and costs of commissioning of new hydro aggregates.